Project Manager Updated On Tue, Jun 18th, 2024 by Saurenergy Provides technical support for NEXTracker customers worldwide, ensuring a best-in-class customer experience and providing product and systems expertise to maximize customer value Develop and maintain technical understanding of PV solar tracking systems and associated tools Supports the Project Manager, Senior Project Manager, and/or Program Manager in all activities that drive Customer Satisfaction and order fulfillment […] Read more
Senior Manager – Materials Planning & Project Deliveries Updated On Tue, Jun 18th, 2024 by Saurenergy The Senior Manager – Materials Planning & Project Deliveries will be based in Hyderabad. In this position, you will report to the Head of APAC Planning. We are looking for a dynamic supply chain professional to lead supply & delivery planning activities within materials planning department. This individual will own customer order fulfilment for solar […] Read more
Mechanical Test Engineer Updated On Thu, May 30th, 2024 by Saurenergy Complete product testing and qualification as per test requirements. Setup the test rig along with fixtures for component qualification. Analyze the test results using the relevant test software. Create and publish the test reports. Designing the test fixtures. Modelling the tracker parts and creating component & assembly drawings. Support engineering teams with fixture design and […] Read more
Design Engineer – Mechanical/Sustainable Engineering Updated On Thu, May 30th, 2024 by Saurenergy The Design Engineer will be based in Hyderabad. In this position, you will report to the Manager – Mechanical Engineering. This position will work on product development, design optimization, prototype generation, creating manufacturing drawings, perform FEA and assist in prototypes in testing facility to meet ensure minimum product standard before product release. Watch this video […] Read more
AI’s Growing Energy Footprint: The Hidden Cost of Our Digital Future Updated On Wed, May 22nd, 2024 by Saurenergy It’s time to talk about Artificial Intelligence (AI), and its possible impact on the environment. Convenient as it may be, AI is an energy hog. A single ChatGPT query requires 2.9 watt-hours of electricity, compared with 0.3 watt-hours for a Google search, according to the International Energy Agency. At present, data centers worldwide consume 1-2% […] Read more
UPERC Grants Compensation To SAEL For Increased GST Rates Updated On Tue, May 21st, 2024 by Saurenergy The Uttar Pradesh Electricity Regulatory Commission (UPERC) in its latest judgement allowed compensation to SAEL Limited, a solar power generator. The company had earlier moved the state power regulator seeking compensation on account of increase in its project cost due to the rise of Goods and Services Tax (GST). The company had installed a 32 […] Read more
Renewables Can Bring Down Singapore’s Gas Dependency To 61%: EMBER Updated On Thu, May 2nd, 2024 by Saurenergy A recent report from energy think tank EMBER said that Singapore’s heavy reliance on gas-based electricity could be cut down with the expected rise of renewables in the country. The report said that based on its calculations, the share of electricity from gas would drop from 92% in 2022 to 61% by 2035. This was […] Read more
Manager- BD & Sales IND Updated On Mon, Apr 29th, 2024 by Saurenergy Roles & Responsibilities:- First Solar is a leader in the development and manufacturing of thin film solar modules used in grid-connected solar power plants, and is in the process of establishing a 3.3GW/annum integrated solar PV module manufactruing facility in India. Our culture is one where teamwork, continuous improvement, achievement of results, and environmental responsibility […] Read more
Premier Energies Secures 140 MW PV Modules Order In Bangladesh Updated On Thu, Apr 18th, 2024 by Saurenergy Premier Energies subsidiary Premier Energies Photovoltaic has secured a 140 MW PV modules supply order from Amara Raja Infra for a solar project in Bangladesh. The project is being executed on an EPC basis by Hyderabad-based Amara Raja Infra. The module supply is expected to be completed by April 2025. Premier Energies has witnessed a […] Read more