Nextracker Acquires Bentek Corp. To Add Electrical Infra To Services Updated On Thu, May 15th, 2025 by Saurenergy Nextracker, a leading solar technology platform provider, announced it has acquired U.S.-based Bentek Corporation, an industry pioneer and manufacturer of electrical infrastructure used in all types of solar power plants. The all-cash transaction of approximately $78 million including future contingent earnout consideration combines Bentek’s engineered, pre-assembled eBOS solutions with Nextracker’s solar tracker platform, providing customers […] Read more
Area Manager- Semiconductor Updated On Thu, Apr 24th, 2025 by Saurenergy Manages and leads assigned shift semiconductor production, engineering, and maintenance resources in the production of photovoltaic modules to meet shift goals in terms of Safety, Quality, Yield, and Throughput. Essential Responsibilities:- Safety & 5S:- Drives and promotes a strong “safety-first” culture and world class house-keeping standards within plant operations to enable a zero-recordable rate. Timely […] Read more
Assam Discom Issues EoI For 357 MW Project Under PM-KUSUM Comp-A Updated On Thu, Apr 24th, 2025 by Saurenergy Assam Power Distribution Company Ltd (APDCL), has floated a tender to develop 357 MW of solar capacity under Component-A of the PM-KUSUM scheme. Bids will be accepted until May 8, 2025. The Assam Discom’s latest tender for 357 MW solar project under PM KUSUM will be spread across 272 locations, ranging from Nagaon ESD-II in […] Read more
Senior Supply Planner Updated On Tue, Apr 22nd, 2025 by Saurenergy The Senior Supply Planner will be based in Hyderabad. In this position, you will report to the Director, APAC Planning. The Senior Supply Planner brings tactical expertise & strategic thinking to support a world-class demand-driven supply chain. In this role, you will be responsible for all aspects of supply planning for our solar tracker components […] Read more
FY25: Adani Green Energy Operational Capacity Reaches 14.2 GW Updated On Tue, Apr 15th, 2025 by Saurenergy Adani Green Energy Ltd (AGEL) reported a 30% year-on-year increase in operational capacity to 14.2 GW in FY25, with an additional 1 GW nearing completion, the company said in its provisional operational update. The company in a recent update shared, “Adani’s energy sales rose 28% year-on-year to 27,969 million units during the fiscal year, driven […] Read more
PLI Should Be Extended To Agri-Based Manufacturers: ICRIER Updated On Wed, Apr 9th, 2025 by Saurenergy The latest Indian Council for Research on International Economic Relations (ICRIER), report called for extending India’s production-linked incentive (PLI) scheme—currently supporting domestic solar panel manufacturing—to include low-carbon agricultural technologies. These could include livestock feed additives that reduce methane emissions (such as Rumen8) and biofertiliser products, the report added. India’s agriculture sector is vulnerable to climate […] Read more
PM-KUSUM: Gujarat Discom Gets The Lowest Tariff of Rs 2.15/kWh Updated On Tue, Apr 8th, 2025 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) has now approved the tariffs for Component-C of the PM-KUSUM scheme. Earlier, Madhya Gujarat Vij Company Limited (MGVCL) had approached the state electricity regulator seeking to adopt the tariffs. These tariffs were discovered through a tariff-based competitive bidding process. Earlier, a tender was floated by MGVCL seeking parties who […] Read more
Site Manager – Electrical Updated On Fri, Apr 4th, 2025 by Saurenergy You shall perform the following functions including but not limited to:- Perform field quality inspections, materials inspections, and raise Requests for Inspection (RFI). Ensure non-conformities (NC) are addressed as per client requirements, and close NC issues with proper documentation. Prepare daily inspection reports, PowerPoint presentations, quality assurance documents, NC log sheets, and other related reports […] Read more
OREDA Issues Tender, Seeking EPC Contractors For PM-KUSUM Updated On Thu, Mar 13th, 2025 by Saurenergy Odisha Renewable Energy Development Agency (OREDA) has issued a tender seeking EPC contractors to take up solarisation works under PM-KUSUM scheme. As per the mandate, the state nodal agency is seeking companies who can take up the works under the Component-A of the central government scheme. The OREDA tender said that the contractors need to […] Read more