NISE Conducting Three Days Skill Development Program on Chartered Engineers from 18th July, 2017 Updated On Tue, Jul 4th, 2017 by Saurenergy Chartered Engineers Electrical / Electronic and Mechanical By institution of Engineers(INDIA) can participate in this NISE ‘s training program, training Fee per participant is Rs 20,000 National Institute of Solar Energy (NISE), an autonomous center of excellence of Ministry of New and Renewable Energy is conducting three days skill development program on chartered engineers from […] Read more
Silicon Consumption to Drop to 3.6 Grams per Watt by 2020: Bernreuter Research Updated On Tue, Jun 27th, 2017 by Saurenergy “The polysilicon industry has to prepare for the fact that demand is slowing down on two fronts: The annual growth rate of global photovoltaic installations is decreasing, and the polysilicon consumption for each new gigawatt installed in 2020 will be only half as much as it was in 2010.” The average silicon consumption for manufacturing […] Read more
Finnish Demo Plant Uses Carbon Dioxide to Produce Renewable Fuels and Chemicals Updated On Mon, Jun 12th, 2017 by Saurenergy The Finnish demo plant comprises four separate units: a solar power plant; equipment for separating carbon dioxide and water from the air; a section that uses electrolysis to produce hydrogen; and synthesis equipment for producing a crude-oil substitute from carbon dioxide and hydrogen. VTT Technical Research Centre of Finland and Lappeenranta University of Technology (LUT) […] Read more
Tigo Adds Two New Optimizers to UHD-Core Technology Platform Updated On Thu, Jun 1st, 2017 by Saurenergy Tigo’s New Optimizers featuring UHD-Core (Ultra-High Definition) technology TS4-M and TS4-S will be shipping as an integrated and retrofit/add S on solution. Tigo, pioneer of the smart modular Flex MLPE platform has announced the second worldwide release of its next generation of solar optimizers featuring UHD-Core (Ultra-High Definition) technology: TS4-M (Monitoring) and TS4-S (Safety). The […] Read more
CHANCES & CHALLENGES RELATED TO EPC Updated On Sat, May 27th, 2017 by Saurenergy As the world moves towards the sustainable development, India looks to optimize its energy mix with minimum carbon footprints. India is in the midst of a momentous leap in terms of the proposed use of solar power as part of its overall renewable energy mix. India with its 100GW of solar energy target by 2022 is […] Read more
MNRE invites EoI from qualified Professionals as Trainers for Technical Assistance Program Updated On Thu, May 18th, 2017 by Saurenergy It is proposed to impart training to 10,000 Utility Engineers and 5,000 Entrepreneurs in the country as a part of Ministry’s initiative on imparting skill. As directed by MNRE, NISE shall be the implementing agency for the same. To cater these training requirements, it is required to create a pool of trainers in this sector […] Read more
SECI issues NIT for the engagement of Agency for hiring of Professional Support Staff at its registered office Updated On Mon, May 8th, 2017 by Saurenergy Last date for submission of the bid for engagement of Agency for hiring of Professional Support Staff at Solar Energy Corporation of India Limited (SECI) is 5th June 2017. Solar Energy Corporation of India Limited (SECI) is inviting bids from the eligible Bidders/Firms/Agencies to participate in the Notice Inviting Tender (NIT) for “The engagement of […] Read more
Google’s Project Sunroof Launched in Germany Updated On Thu, May 4th, 2017 by Saurenergy A solar power initiative started by Google engineer Carl Elkin, Project Sunroof stated purpose is “mapping the planet’s solar power potential, one roof at a time, and now it has been launched in Germany. Google’s Project Sunroof, which estimates whether homes get enough sunlight to switch over to solar power, has been launched in Germany. […] Read more
Utility Scale O&M Practices Updated On Thu, Apr 20th, 2017 by Saurenergy India has been moving ahead aggressively with an ambitious programme to reach an installed capacity of 100GW solar power by 2022. Many states are setting up Multi-megawatt solar power installations to herald the arrival of the renewable energy generation. Solar Power Plants are built to last 25 years or more. However, after the Engineering Procurement […] Read more