Ellomay to Buy 300 MWp Spanish Solar Power Project Updated On Wed, May 3rd, 2017 by Saurenergy Ellomay has entered into a SPA, acquiring the Spanish firm behind the project, Talasol Solar’s 300 MW solar power project with purchase amount of EUR 10 million. Ellomay Capital Ltd., an emerging operator in the renewable energy and energy infrastructure sector has announced its entry, through one of the Company’s subsidiaries, into a share purchase […] Read more
Agreements Signed For 120 MW of Solar Power Projects in Nigeria Updated On Tue, May 2nd, 2017 by Saurenergy Afrinegia Nigeria Limited and CT Cosmos Nigeria Limited have inked an agreement for put/call option with the Ministry of Power Works and Housing for 120 MW of Solar Power Projects in Nigeria Two more solar project developers have signed financial risk agreements for utility-scale solar power projects in Nigeria, strengthening the country’s roadmap towards becoming […] Read more
SECI Reduces Levelized Ceiling Tariff for 500 MW Rooftop Solar Power Tender Updated On Tue, May 2nd, 2017 by Saurenergy The updated Levelized Ceiling Tariff 500 MW Rooftop Solar Power Tender is lower than the previous benchmark by Rs.1.03/kWh in general category states and union territories, and lower by Rs.0.40/kWh in special category states and union territories. The Solar Energy Corporation of India (SECI) has reduced the levelized ceiling tariff for the amended 500 MW […] Read more
Scientists at IIT Roorkee Create More Efficient and Low Cost Solar Cells Using Jamun Updated On Mon, May 1st, 2017 by Saurenergy Naturally occurring pigment found in jamun as an inexpensive photosensitiser for Dye Sensitized Solar Cells (DSSCs) or Gratzel cells have been used to create More Efficient Solar Cells. Scientists at IIT Roorkee have used the juicy, delectable Indian summer fruit Jamun to create inexpensive and more efficient solar cells. Researchers used naturally occurring pigment found […] Read more
Mumbai Metro One Private to Utilize Solar Panels to Meet its Power Needs Updated On Mon, May 1st, 2017 by Saurenergy The electricity generated from the solar panels will be utilized for operations of various Mumbai Metro stations equipment such as lighting, air-conditioning, lifts, escalators and pumps. From May onwards, Mumbai Metro One Private Ltd (MMOPL) will source 30% of its non-traction energy requirement through solar panels which have been installed at Andheri and Ghtatkopar Metro […] Read more
China Flaunts Solar Boom Drives the Global Solar Market Updated On Mon, May 1st, 2017 by Saurenergy Latest report has unveiled record solar demand in China which has dramatically moulded the global PV installation for 2017. Chinese demand exceeded 34 gigawatts last year, pushing global installed solar capacity just over 78 gigawatts. These latest figures oust the 51 gigawatts of solar installed in 2015, and puts cumulative installed capacity beyond 306 gigawatts […] Read more
ADB Backs Sunseap to Build Cambodia’s First Large-Scale Solar Power Farm Updated On Mon, May 1st, 2017 by Saurenergy As part of the Cambodia’s First Large-Scale Solar Farm project, Sunseap entered into a 20-year solar power purchase agreement (PPA) with EDC. The Asian Development Bank (ADB) has backed Singapore’s Sunseap Group’s project to build Cambodia’s first large-scale solar power project under a long-term agreement with Electricité Du Cambodge (EDC). ADB’s Private Sector Operations Department […] Read more
Himachal Pradesh Energy Development Agency Tenders 1.1 MW of Rooftop Solar Updated On Sat, Apr 29th, 2017 by Saurenergy The Himachal Pradesh Energy Development Agency 1.1 MW rooftop solar power project will consist of 50 rooftop solar systems installed on different buildings of HRTC. The Himachal Pradesh Energy Development Agency tendered 1.1 MW of rooftop solar in Himachal Pradesh. The bid-submission deadline is May 12, 2017. The entire capacity will consist of 50 rooftop […] Read more
Central Electronics Limited Tenders 3.22 MW of Rooftop Solar Power Project for Northern Railways Updated On Fri, Apr 28th, 2017 by Saurenergy The 3.22 MW rooftop solar power project will be developed under the RESCO model and the project completion timeframe is nine months. Central Electronics Limited (CEL) tendered 3.22 MW of grid-connected rooftop solar to be installed at railway workshops under Northern Railway across Indian states. The bid-submission deadline is May 26, 2017. The CEL stated, […] Read more