Free Solar Power Plant for 800 Houses in Kerala by KSEB Updated On Mon, Nov 28th, 2022 by Saurenergy In an announcement that might set a precedent for other Indian states to follow, the Kerala State Electricity Board (KSEB) will install rooftop solar power plants for 800 homes in Kerala. The breakup of this number will compose of 500 homes for the homeless as per the Life Mission Scheme. The remaining 300 will be […] Read more
Solar Is Changing Fast, Here Are 5 Ways It Already Has Updated On Mon, Nov 28th, 2022 by Saurenergy When the Jawaharlal Nehru National Solar Mission was launched back in January 2010, India had a total installed solar capacity of around 160 MW. The mission itself had a target of 20 GW by 2022. However, changes on the ground in terms of technology, availability and fresh climate realities meant a wholesale upgrade on those […] Read more
JinkoSolar to Supply 522 MW of Modules for Brazil’s Solar Project Updated On Mon, Nov 28th, 2022 by Saurenergy JinkoSolar Holding Co. Ltd., among the largest and most innovative solar module manufacturers in the world, has revealed that its principal operating subsidiary, Jinko Solar Co., Ltd. (“Jiangxi Jinko”) will supply nearly 522 MW of Tiger Neo 78 cell modules for Phase l of the Santa Luzia Complex Project (the “Project”) in Paraíba State, Brazil. […] Read more
HCG Hospital Chain Installs 2.25 MW Solar Power Plant Updated On Mon, Nov 28th, 2022 by Saurenergy Hospitals in India have been recognising the many advantages of installing solar panels, such as curbing electricity bills since healthcare is an energy intensive industry. Among the most recent hospitals to take the solar route is Healthcare Global Enterprises Ltd (HCG), which is among the largest cancer care hospital chains in India. In a bid […] Read more
SJVN Begins Operating 75 MW Parasan Solar Project in Uttar Pradesh Updated On Fri, Nov 25th, 2022 by Saurenergy The state-run company, SJVN Ltd.’s 75 MW Parasan Solar Power Project, Uttar Pradesh, has achieved commercial operation, according to Nand Lal Sharma, Chairman & Managing Director. The installed capacity of SJVN is now 2091.5 MW. To build a 75 MW solar power project at the Parasan Solar Park in Uttar Pradesh, state-owned SJVN signed a […] Read more
NTPC Floats 1200 MW of BoS Tender for Solar Project in Kutch, Gujarat Updated On Fri, Nov 25th, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) Renewables has floated a balance of system (BOS) tender package for a 1200 MW (4 X 300 MW) solar project at Khavda RE power park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC BOS tender is January 09, 2023, till 03:00 pm and […] Read more
Voltalia Signs 15-Year Solar Power Supply Contract with Renault Updated On Fri, Nov 25th, 2022 by Saurenergy French renewable energy providing firm, Voltalia, and French automobile manufacturer Renault have entered into a 15-year solar power supply agreement. The agreement will facilitate Renault to make the transition to cleaner energy. 350 megawatts of total capacity, or roughly 500-gigawatt hours of annual production, are covered by the deal. This 15-year commitment is the first-of-its-kind […] Read more
Actis’ BluPine Energy Buys 404 MW of Solar Power Assets from Atha Updated On Fri, Nov 25th, 2022 by Saurenergy Delhi-based renewable energy and storage solution provider company, that is 100% backed by global investment firm Actis Llp, BluPine Energy has purchased 404 MW of solar power assets from Atha Group, a private equity corporation headquartered in London. The enterprise value of the solar assets owned by Atha in this transaction is close to Rs. […] Read more
ANERT Invites Bids to Develop 15 MW of Rooftop Solar Projects in Thiruvananthapuram Updated On Thu, Nov 24th, 2022 by Saurenergy The Agency for New and Renewable Energy Research and Technology (ANERT) has invited bids for the development of 15 MW of rooftop solar installations in Thiruvananthapuram. The last date for submitting the bid for this Agency for New and Renewable Energy Research and Technology (ANERT) 15 MW tender is November 29, 2022, at 05:00 pm, […] Read more