KUSUM Comp C: SJVN Green Floats 951 MW Solar EPC Tender In Maharashtra Updated On Wed, Jul 2nd, 2025 by Saurenergy SJVN Green Energy Ltd, a subsidiary of SJVN, has invited bids for an EPC contract to develop 951 MW of solar projects under the Mukhymantri Saur Krushi Vahini Yojana 2.0 (MSKVY 2.0) in Maharashtra. The tender falls under Component C of the central government’s PM-KUSUM scheme and includes comprehensive operation and maintenance (O&M) for a […] Read more
Solar Pumps: Junna Solar Bags R 114.58cr Order From MEDA Updated On Wed, Jul 2nd, 2025 by Saurenergy Junna Solar has bagged a work order worth ₹114.58 crore from MEDA (Maharashtra Energy Development Agency) for the installation of off-grid solar pumps. This latest order is set to bolster the company’s order book, pushing it towards the ₹200 crore mark for Q1 of FY 2025–26. Securing a ₹200 crore order book in Q1 is […] Read more
Hindustan Power Gets LoA For 100 MW Solar+BESS Project Updated On Tue, Jul 1st, 2025 by Saurenergy Ratul Puri’s energy company Hindustan Power, an integrated power generation company, has been awarded a 100 MW inter-state transmission system (ISTS)-connected solar power project along with a 200 MWh BESS from SJVN Limited, a Navratna Central Public Sector Enterprise. The actual installed capacity of the solar project will be substantially higher, not only to supply […] Read more
Bikaner: NHPC Commissions 214.28 MW Of Karnisar Solar Project Updated On Tue, Jul 1st, 2025 by Saurenergy NHPC recently partially commissioned its Karnisar Solar Power Project in Bikaner, Rajasthan. “After successful completion of the trial run on June 29, 2025, commercial operation of the fourth phase, with a part capacity of 53.57 MW, commenced from June 30, 2025,” NHPC said. With this, the cumulative operational capacity of the project has reached 214.28 […] Read more
Maharashtra’s New Tariff Order Likely to Hit C&I Solar Profitability Updated On Tue, Jul 1st, 2025 by Saurenergy The latest MYT tariffs approved by the Maharashtra Electricity Regulatory Commission (MERC) are likely to reduce the profitability of solar power for commercial and industrial (C&I) consumers. The new tariffs and regulatory changes may limit the savings potential for users of both rooftop solar and green energy through open access. This concern arises from changes […] Read more
Waaree Solar Americas Gets 540 MW Solar Module Order in US Updated On Mon, Jun 30th, 2025 by Saurenergy Waaree Solar Americas, a wholly owned subsidiary of Waaree Energies, has received an order for the supply of 540MW solar modules across the United States, the company said in a regulatory filing. The company said that it received the recent order from a renowned customer who is a developer and owner-operator of utility-scale solar and […] Read more
Solar Pumps: Running On Sunshine But Running Out Of Water Updated On Mon, Jun 30th, 2025 by Saurenergy By-Hanan Zaffar, Jyoti Thakur On his six-acre farm in Jhansi in the north Indian state of Uttar Pradesh, Sanjeev Kumar, a 42-year-old farmer beams with quiet pride as he points to the glinting blue solar panels powering his irrigation pump. Installed two years ago at the cost of ₹3.5 lakhs (₹350,000), the 7-kilowatt system draws groundwater […] Read more
Khavda: NTPC Green Commissions 288.9 MW Solar Projects Updated On Mon, Jun 30th, 2025 by Saurenergy NTPC Green Energy Ltd, the renewable energy arm of India’s state-run power utility NTPC Ltd, has commissioned two solar power projects in Gujarat’s Khavda region with a combined capacity of 288.9 megawatts (MW), the company said in a regulatory filing. The company declared commercial operations of 142.2 MW from its 300 MW Khavda Solar Energy […] Read more
NLC India to Develop 450 MW Wind-Solar Hybrid Power Project Updated On Mon, Jun 30th, 2025 by Saurenergy NLC India Ltd has received a Letter of Award (LoA) from NTPC Ltd for developing a 450 MW Inter-State Transmission System (ISTS) connected wind-solar hybrid power project. The hybrid project will supply electricity to NTPC for a period of 25 years under a Power Purchase Agreement (PPA). The project will be split across two locations […] Read more