Gensol Bags 245 MW Solar EPC Project At Khavda Updated On Fri, Feb 7th, 2025 by Saurenergy Gensol Engineering Limited, a leading player in the renewable energy sector, has further solidified its position as a key driver of India’s energy transition by securing a significant EPC contract. The company has been awarded a contract by a renowned public sector undertaking for the development of a 245 MW Solar PV Project at the […] Read more
Assistant Manager – Quality (Module)_AM Updated On Thu, Feb 6th, 2025 by Saurenergy Responsibilities:- Implementation of Final Quality testing as per manufacturing Quality Plan Final Quality Audit as per Defined Frequency and manufacturing Quality Plan NC management and Identification and Traceability of Non-conforming Materials Perform Data Analysis for Post- Lamination Defects(Visual / EL / IV/ HV) and preparation of Root cause analysis and Action plan for Reduction of […] Read more
Assistant Manager-Solar Site Quality_Electrical Updated On Thu, Feb 6th, 2025 by Saurenergy Ensuring installations are carried out as per approved FQP’s. Supervise & Monitor quality work at project site. Prepare and revise FQAP and checklists. Ensure Quality work through our own Engineers and TPAs. Ensure that NCs are minimised and are closed quickly, and verification of RCA and Corrective actions. Imparting Job specific trainings at site. Auditing […] Read more
Green Stocks Feb 6: Performance Matters Is the Only Mantra, As KPI Green Shines Updated On Thu, Feb 6th, 2025 by Saurenergy With a sterling 60% growth in topline and 80% plus in the bottom line, KPI Green was one of the few stocks to withstand another day of selling pressure among our green stocks today. Almost all other stocks other than Borosil Renewables, felt the pressure, dropping slightly, appreciably, or barely staying in the green like […] Read more
CtrlS Datacenters Unveils Captive Solar Farm — GreenVolt1 Updated On Thu, Feb 6th, 2025 by Saurenergy CtrlS Datacenters Ltd, a data center operator, unveiled its captive solar farm, GreenVolt 1, in India. Phase I, with a capacity of 62.5 MWp, went live in June 2024, while Phase II, with an additional capacity of 62.5 MWp, is under implementation. CtrlS has spent over a year in R&D optimizing the project and complying […] Read more
Green Stocks Feb 5: Cautious Recovery Continues For Green Stocks Updated On Wed, Feb 5th, 2025 by Saurenergy On a day when the midcap and small-cap indices were strong, the green energy cap also made the most of the recovery in the air. While Shakti Pumps was back at the upper circuit limit, seeking a return to previous highs, Adani Green also staged a smart recovery to trade well over Rs 1000 again. […] Read more
5 Reasons Why BESS Will Be a Focal Point of Energy Business in 2025 Updated On Wed, Feb 5th, 2025 by Saurenergy Battery Energy Storage Systems (BESS) are a very crucial component of the renewable future that the world envisions. Recent years saw a tremendous increase in renewable energy and with it energy storage solutions, like BESS, emerged as a missing piece of the puzzle in competition against fossil-based power to dominate the energy sector. As a […] Read more
Green Stocks Feb 4: Stocks Rebound Sharply Updated On Tue, Feb 4th, 2025 by Saurenergy As the broader markets heaved a sigh of relief by bouncing back sharply, our green pack had a tough time keeping up. Thus even as most shares rose, many could not quite match the exuberance of the broader markets. That points to a fatigue among investors for the green energy theme, and the focus on […] Read more
Lead Controls Engineer Updated On Tue, Feb 4th, 2025 by Saurenergy The Lead Controls Engineer works as part of the Power Conversion & Storage controls engineering team in an international environment and will be responsible for validation, field implementation and maintenance of GE’s Solar, BESS and Hybrid Software and Control Systems for Projects. This includes but it is not limited to AC system, DC system, Building, […] Read more