News
Delhi Power Minister Launches BSES’ Solar City Initiative Phase-2
Ginlong Solis entered the GTM Rankings Once Again
Jolywood was Invited to Participate in the First Belt and Road Energy Ministerial Conference
Low-ceiling tariff by SECI gets auction postponed again for 1200 MW Hybrid Tender
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v)
Extension 04 of Bid Submission of Setting up of 02 mw Solar Power Project with 01 mwh Bess at Kaza, Himachal Pradesh
Amendment - 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India
Tata Power Delhi Distribution Makes Prior Arrangements to Meet Peak Power Demand This Winter Season
/saur-energy/media/agency_attachments/2025/06/20/2025-06-20t080222223z-saur-energy-logo-prasanna-singh-1-2025-06-20-13-32-22.png)
/saur-energy/media/post_attachments/2018/10/solar-city.jpg)
/saur-energy/media/post_attachments/2018/10/gtm-rankings-about-global-pv-string-inverters.jpg)
/saur-energy/media/post_attachments/2018/10/heraeus-electronics-innovation-center-in-shanghai.jpg)
/saur-energy/media/post_attachments/2018/10/belt-and-road-energy.jpg)
/saur-energy/media/post_attachments/2018/10/hybrid-tender.jpg)
/saur-energy/media/post_attachments/2016/12/Piyush-Goyal-2.jpg)
/saur-energy/media/post_attachments/2018/08/solar-wind-hybrid-power-plant.jpg)
/saur-energy/media/post_attachments/2017/11/solar-power-projects.jpg)
/saur-energy/media/post_attachments/2017/05/Solar-Energy-Corporation-of-India.jpg)
/saur-energy/media/post_attachments/2018/10/tata-power-delhi-distribution.jpg)
/saur-energy/media/media_files/2025/09/16/cosmic-2025-09-16-13-53-51.jpg)