Jolywood was Invited to Participate in the First Belt and Road Energy Ministerial Conference Updated On Mon, Oct 29th, 2018 by Saurenergy Jolywood (Suzhou) Sunwatt Co. Ltd. (SZ: 300393) (Jolywood), the world’s leading supplier of N-type high efficiency bifacial solar cells and modules, was a key participant in the 2018 Belt and Road Energy Ministerial Conference and International Forum on Energy Transition (“the Conference”) to discuss energy cooperation and the future of new energy. Mr. Lin Jianwei, […] Read more
Piyush Goyal Gets Top Prize in Energy Policy Updated On Sat, Oct 27th, 2018 by Saurenergy As former Minister of Power and Renewables, Goyal fast-tracked the electrification of 18,000 remote villages in India—bridging the country’s vast energy divide. The Kleinman Center for Energy Policy bestowed its highest award ‘Carnot Prize’ to Piyush Goyal, India’s former Minister of Power and Renewables and current Minister of Railways and Coal. As former Minister of […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
Amendment – 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India Updated On Sat, Oct 27th, 2018 by Saurenergy Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, India RFB […] Read more
Tata Power Delhi Distribution Makes Prior Arrangements to Meet Peak Power Demand This Winter Season Updated On Sat, Oct 27th, 2018 by Saurenergy Tata Power Delhi Distribution (Tata Power – DDL) expects a peak demand of approximately 1500 MW in this winter season. The long term power tie ups are in place for meeting the same effectively. A total of 1650 MW of power is available from long term sources which would help in meeting the winter peak […] Read more
Waaree Energies Expands Footprint to SE Asia; Bags 60 MW Solar Project in Vietnam Updated On Fri, Oct 26th, 2018 by Saurenergy The company will be using its high efficiency mono-crystalline panels for this project. One of the leading solar PV manufacturer Waaree Energies has secured a 60 MW ground mounted on-site solar project in Vietnam. With the Turnkey Engineering, Procurement and Construction (EPC) contract, along with Operations and Maintenance (O&M), the project also marks the company’s […] Read more
US Wind Turbine Market to be Driven by Decarbonization Targets and Favorable Regulatory Directives Updated On Fri, Oct 26th, 2018 by Saurenergy Global wind turbine market players recently witnessed a path-breaking announcement by energy giant GE, regarding the deployment of the most powerful offshore wind turbine called the Haliade-X in 2021. The deployment of the 12-megawatt wind turbine is expected to put GE in the leading position in the offshore wind turbine market as the new wind […] Read more
Risen Energy Wins 50MW PV Contract from Bitexco Group’s Arm Updated On Fri, Oct 26th, 2018 by Saurenergy The electricity generated by the project will be provided to EVN, the Vietnamese state grid. Australia-based solar PV panels maker Risen Energy has won the bid for the NHI HA 50MW solar power station project owned by Vietnam-based Bitexco Group’s subsidiary Thap Cham Solar. The company said in a statement that, combined with the contracts won by […] Read more
Reliable Raw Material: strengthening the back bone of pv module! Updated On Fri, Oct 26th, 2018 by Saurenergy Identifying reliable raw material for any product is a crucial to ensure that the product lives for its lifetime. With the competitive market condition along with requirement of being cost competent selecting correct raw material to strive a perfect balance between commercial and technical terms in the product is a challenge. The scenario in case […] Read more