CIL Issues Tender For 1 GW Solar Project At Rajasthan Solar Park Updated On Thu, Apr 17th, 2025 by Saurenergy Coal India Ltd (CIL) has floated a tender to develop a 1 GW grid-connected solar power project at the 2,000 MW solar park of Rajasthan Rajya Vidyut Utpadan Nigam Ltd (RVUNL) in Pugal, Bikaner district, Rajasthan. CIL invited bids until May 7, 2025, CIL said in the tender document. The scope of work mandated the […] Read more
UltraTech To Tap AMPIN’s 75 MW Solar Project For Captive Power Updated On Thu, Apr 17th, 2025 by Saurenergy UltraTech Cement has signed an energy supply agreement and a share subscription and shareholders agreement to acquire a 26% stake in AMPIN C&I Power Eight Private Limited, a company involved in the generation and transmission of renewable energy. AMPIN C&I Power Eight, based in New Delhi, is a special purpose vehicle (SPV) set up to […] Read more
Waaree Renewable Delivers With Strong Finish To FY25 Updated On Thu, Apr 17th, 2025 by Saurenergy Waaree Renewable Technologies Ltd. (WRTL), one of India’s fastest-growing and largest solar EPC companies, announced its audited financial results for Q4 and full-year FY25 on Apr 16. WRTL’s Q4 FY25 revenue from operations reached ₹476.58 crore, marking a 32.3% increase sequentially from ₹360.35 crore in Q3 FY25 and a 74.5% increase YoY from ₹273.31 crore […] Read more
Green Stock April 16: Caution Rules, Mostly Updated On Wed, Apr 16th, 2025 by Saurenergy After the sharp rise we saw yesterday, the markets were a lot more cautious today. Thus, despite a modest rise in the indices, most green energy stocks trailed in terms of gains, or even gave up some gains made yesterday. There is a clear flight to size as we can see now, with one of […] Read more
Q4 FY25: IREDA Posts ₹1,699 Cr Annual Profit, Up 36% YoY Updated On Wed, Apr 16th, 2025 by Saurenergy The Indian Renewable Energy Development Agency (IREDA) records an annual profit after tax (PAT) of ₹1,699 crore for the financial year ended March 31, 2025, marking a 36% jump from the previous year. The state-run green financing firm said PAT for the fourth quarter (Q4 FY2024) rose 49% year-on-year to ₹502 crore. Profit before tax […] Read more
Emmvee Opens 5th Solar Module Plant, Lifts Capacity To 6.6 GWp Updated On Wed, Apr 16th, 2025 by Saurenergy Indian solar manufacturer Emmvee has opened its fifth module manufacturing facility at Sulibele, near Bengaluru International Airport, adding 2 GWp of photovoltaic (PV) module capacity. With the latest expansion, the company’s total PV module capacity now stands at 6.6 GWp, while solar cell capacity has reached 2.5 GWp. The 400,000-square-foot facility will employ more than […] Read more
2024: Global Solar Capacity Tops 2.2 TW, With Over 600 GW New Additions Updated On Wed, Apr 16th, 2025 by Saurenergy Global cumulative solar photovoltaic (PV) capacity rose to more than 2.2 terawatts (TW) by the end of 2024, up from 1.6 TW in 2023, with over 600 GW of new systems commissioned, the International Energy Agency’s Photovoltaic Power Systems Programme (IEA PVPS) said in its latest report. “Module prices continued to drop through 2024 in […] Read more
Bigger & Faster – South India’s Renewable Comeback Updated On Wed, Apr 16th, 2025 by Saurenergy South India, which heralded some of the earliest large-scale solar and wind projects in the country, is now further expanding its clean energy footprint. Again, one could say that some of India’s most notable renewable achievements came from the region before 2020. From the then-largest solar plant at Kamuthi in Tamil Nadu with a 648 […] Read more
BrightNight, Hero Future Energies Inks PPA With NTPC For FDRE Project Updated On Wed, Apr 16th, 2025 by Saurenergy BrightNight has signed a power purchase agreement (PPA) with state-run NTPC to supply 110 MWac of firm and dispatchable renewable energy (FDRE) over 25 years. The company said, “The energy will be delivered from a 350 MWp solar-wind hybrid project integrated with a 100 MWh battery energy storage system in Rajasthan, and connected via the […] Read more