L&T Q3 Profit Jumps 53%; Gross Revenue up 9.4%; Bags Solar Orders Updated On Tue, Feb 20th, 2018 by Saurenergy The company has secured a major order from the domestic market for EPC construction of 250MW (AC) Solar Plant in Rewa district of Madhya Pradesh. India’s largest construction and engineering firm, Larsen & Toubro Ltd, has reported impressive growth of 53 per cent in its consolidated net profit after taxes (PAT) at Rs 1,490 crore for […] Read more
Gigawatt of Storage in 2018? Updated On Mon, Feb 19th, 2018 by Saurenergy From a Gigawatt dream storing capacity to watt-hour storage, through decades the glorified history of technology is meekly stored with the wonk of storage development. The interdependency to make solar power modus operandi is the associated technology which can store the continuous flow of electricity and deliver it diligently on the time of respective requirement. […] Read more
Leclanche Selects Nextracker’s NX Drive Energy Storage System for Various Applications Updated On Mon, Feb 19th, 2018 by Saurenergy NX Drive provides a flexible, pre-engineered balance-of-system (BOS) solution for virtually any generation-plus-storage or stand-alone storage application. NEXTracker, a Flex company, has announced that Leclanche, a global integrator of energy storage, has selected NEXTracker to supply its NX Drive energy storage system (ESS) for battery solutions the company is installing at commercial and industrial businesses […] Read more
SPECIAL GENERAL PROCUREMENT NOTICE FOR 160 MW SOLAR-WIND HYBRID POWER PLANT IN THE STATE OF ANDHRA PRADESH Updated On Mon, Jan 22nd, 2018 by Saurenergy Solar Energy Corporation of India (SECI) Ltd invites eligible interested bidders to indicate their interest who wish to participate in the tendering process for the large-scale Solar-Wind Hybrid Power Plant(s) project, with energy storage solution, with a cumulative capacity of about 160 MW in Ramgiri district of the State of Andhra Pradesh. Solar Energy Corporation […] Read more
Year End Review 2017 –MNRE Updated On Wed, Dec 27th, 2017 by Saurenergy Government is on its way to achieving 175 GW target for installed Renewable Energy capacity by 2022 India attains 6th position in global Solar Power installed capacity By November 2017, a total of 62 GW Renewable Power installed, of which 27 GW installed since May 2014 and 11.79 GW since January 2017 Historic Low Tariffs […] Read more
Ramanathapuram in Tamil Nadu to Set Up a 500MW Solar Power Plant Updated On Tue, Dec 19th, 2017 by Saurenergy A subsidy of Rs 20 Lakh is allotted for every MW of generated capacity set up within the park. Tangedco has received the approval from the centre for setting up a 500 MW solar park in the district of Ramanathapuram. The project is sighted to be the country’s first set up to be built government-owned […] Read more
INDIA Marches Ahead Updated On Wed, Dec 13th, 2017 by Saurenergy As 2017 comes to an end, it is worth taking a holistic look at the Indian solar market to analyze key trends, challenges and outlook. By many accounts, the Indian solar power industry is on a roll. According to a report released by consulting firm Bridge to India, India is expected to reach an installed […] Read more
HEEDING the Call for CYBER SECURITY in Renewable Energy Updated On Mon, Dec 11th, 2017 by Saurenergy This is a challenge, but even more so, it is an opportunity to advance the collective technologies towards the attainment of solar cyber security worldwide. In 2012, a computer virus, dubbed Stuxnet, disabled 1000 of Iran’s 5000 centrifuges, detailing a joint US-Israel cyber security attack on Iran that undermined its nuclear enrichment facilities. In 2014, Unit […] Read more
MNRE Releases List of Sanctioned Solar Parks under the Solar Park Scheme Updated On Fri, Dec 1st, 2017 by Saurenergy Solar parks across various states in the country, each with a capacity of Solar Projects generally above 500 MW will be built. In a bid to provide clean energy to the citizens of India PM Narendra Modi earlier has revised national solar mission capacity from the current 22 gigawatt (GW) to 100 GW by 2022. The […] Read more