REIL Tenders For Solar Plants At Training, Educational Institutions in Rajasthan Updated On Mon, May 3rd, 2021 by Saurenergy The Rajasthan Electronics and Instruments Limited (REIL) has come out with a tender for the “Survey, Design, Supply of BOS, Installation – Commissioning and 5 years maintenance of various capacity Grid Connected SPV Power Plant(s) at various Training Institutions / Educational Institutions in various districts in the state of Rajasthan” . A pre-bid meeting will […] Read more
Italy’s Ecology Minister: 72% power to come from Renewables in 2030 Updated On Thu, Apr 29th, 2021 by Saurenergy Italy’s Ecology Transition Minister Roberto Cingolani revealed yesterday that the country will have to produce as much as 72% of its electricity with renewable sources in 2030 so as to fulfil the European emissions-reduction target of 55% set for the same year. While in conversation with the Italian daily la Repubblica, he said, “In 2030, […] Read more
Regulatory Over-reach in South Australia’s Switch-off of Household Rooftop Solar Updated On Thu, Apr 29th, 2021 by Saurenergy IEEFA has detailed a ‘worrying’ precedent in South Australia where rooftop solar systems can be remotely switched off without householders’ knowledge. A new briefing note from the Institute for Energy Economics and Financial Analysis (IEEFA) details a ‘worrying’ precedent in South Australia where new measures allow for rooftop solar systems to be remotely switched off […] Read more
ReNew Power to use Robotic Cleaning Solutions From Airtouch Solar Updated On Wed, Apr 28th, 2021 by Saurenergy Airtouch Solar will supply its water-free robotic cleaning systems for three of ReNew Power’s new solar plants in Rajasthan, India. Israel-based clean solutions providers for solar systems Airtouch Solar (Airtouch) has announced that it has signed contracts for the supply of its water-free robotic cleaning systems for application on three of ReNew Power’s new solar […] Read more
New Deadline for OE Services Related to Solar & Storage Project in Chhattisgarh Updated On Mon, Apr 26th, 2021 by Saurenergy The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for the selection of consultancy firms for Owners Engineer (OE) services for the 100 MW (AC) solar PV project (160 MWp DC capacity) along with 40 MW/120 MWh Battery Energy Storage System (BESS) at district Rajnandgaon, Chhattisgarh during the design, construction, commissioning and preparations […] Read more
New Surge in Downstream Demand has Driven the Polysilicon Shortage to a Crisis Point – JinkoSolar Updated On Sat, Apr 24th, 2021 by Saurenergy In an official statement, the global vice president of Chinese solar manufacturer JinkoSolar, Dany Qian, said that polysilicon prices are not expected to drop for at least six months. The company’s general manager for South & Central Asia, Daniel Liu, stated that Jinko is not backing out from any of the signed deals with its […] Read more
Arriving Soon: Solar Panels that Generate Power at Night Updated On Sat, Apr 24th, 2021 by Saurenergy Can solar panels generate energy even when the sun isn’t around? In a major breakthrough, researchers at the University of California have designed a unique night solar panel (NSP) that can produce 50 W under ideal conditions at night, one-fourth of what traditional solar panel produce during the day. In their paper entitled ‘Nighttime Photovoltaic […] Read more
Over 12.3 GW of Wind-Solar Hybrid Tenders Issued in India Till Date: JMK Updated On Fri, Apr 23rd, 2021 by Saurenergy India has enormous potential for wind and solar energy. But, due to the intermittent and inconsistent nature of both solar and wind power, the Capacity Utilization Factor (CUF) for standalone solar and wind power plants is low. This issue can be partially resolved by blending the energy generated from the two sources as a hybrid […] Read more
Upgrading a Grid Connected PV System To An Energy Storage System Updated On Thu, Apr 22nd, 2021 by Saurenergy Even today, there is a widespread impression among many prospects that a solar system could mean grid independence. Unfortunately, by the time they actually understand the way most solar setups work, especially if you want the benefit of subsidies, they realise that the only way is a grid connected solar plant. However, that is changing. […] Read more