Municipal Corporation Buildings in Ludhiana to be Solar Powered Updated On Fri, Oct 13th, 2017 by Saurenergy Solar panels are to be installed at all four zonal offices of the MC, fire stations at the local bus stand and Hambran Road, MC buildings at Gill Road and multi-level car parking near Mata Rani Chowk. Five more Municipal Corporation buildings will get solar panels as the company handling installation of roof top solar […] Read more
ABB Delivers ABB inverter stations Solar Solutions to El Romero Solar Plant in Chile Updated On Thu, Oct 5th, 2017 by Saurenergy Swiss power electronics specialist ABB has delivered 60 ABB PVS800-IS inverter stations, each rated at 3.6MW at the El Romero Solar Plant, located in Chile’s Atacama Desert. The solar plant is situated in the harsh environment of the Atacama Desert in Chile, 645 km north of the country’s capital Santiago. One of the driest places […] Read more
Renew Power and Hareon Solar Commissions 172MW solar power plant in Dichipally, Telangana Updated On Tue, Oct 3rd, 2017 by Saurenergy This project is the largest joint-venture project between Hareon Solar and ReNew Power and was commissioned ahead of schedule. Hareon Solar and ReNew Power Ventures Pvt. Ltd. has announced the commissioning of their 172 MW (143 MWAC) solar project in Dichipally, Telangana, India. The 172 MW solar power plant spreads over approximately 1100 acres of […] Read more
NTPC Invites Bid for 225MW of Solar Under DCR in Uttar Pradesh Updated On Thu, Sep 28th, 2017 by Saurenergy The 225MW solar power project tender comes under the Domestic Content Requirement (DCR) category, which mandates equipment to be sourced locally. India’s largest utility NTPC has invited bids from eligible bidders on Single Stage Two Envelope Basis (i.e. Envelope-I: Techno-Commercial Bid and Envelope-II: Price Bid) with Reverse Auction for development of aforesaid 225 MW Solar […] Read more
Ujaas Wins 22 MW Rooftop Solar Power Project Updated On Mon, Sep 25th, 2017 by Saurenergy Ujaas Energy has secured a 20.3MW Rooftop Solar Power project from SECI with two other orders from WBREDA for installation and commissioning of 150 rooftop grid connected solar PV power plants. Ujaas Energy, the pioneer of solar REC Mechanism in the Country has announced the winning of much awaited SECI order for an aggregate capacity […] Read more
Let’s Talk Solar Energy Storage Systems Updated On Mon, Sep 25th, 2017 by Saurenergy It is now said to be primitive if we sit with a strong brewed coffee and the board directors of green revolutionaries give a throwback on coal and thermal reserves. Without sharing an anecdote, the facts and figures and latest economics of renewables especially solar has tethered traditional energy production. India has one national grid […] Read more
ABB India bags order to install solar inverters at 750 railway stations in the country Updated On Fri, Sep 1st, 2017 by Saurenergy The 750 stations are located in the busy northern Indian part of the Indian Railways network, one of the most used railway corridors in the world. ABB India has bagged order to install solar inverters at 750 railway stations in north India to reduce dependence on traditional sources of energy. The 750 stations are located […] Read more
How falling solar tariffs are shaping the solar future of India’s 100GW goal Updated On Wed, Aug 30th, 2017 by Saurenergy The technology chapter of solar energy is aerobicized, the growing efficiencies and advance solar cells is aggrandizing operation regardless of robust conditions. In the case of India, the valiant figures of solar integration are extolling and cementing new charts of growth. This unequivocally qualifies the international and national players to proliferate and also aggressively dive […] Read more
SolarReserve Signs Agreement with South Australian Government for 150MW Solar Thermal Project with Energy Storage Updated On Sat, Aug 19th, 2017 by Saurenergy The first of its kind in Australia, the Aurora Solar Energy Project will utilize SolarReserve’s leading solar thermal technology with integrated molten salt energy storage. SolarReserve has signed a long-term Generation Project Agreement (GPA) to build a 150 megawatt solar thermal power station with 8 hours of energy storage near the town of Port Augusta, […] Read more