President assents Continuation Of Phase 3 of Off-Grid and Decentralized Solar PV Applications Programme Updated On Mon, Aug 13th, 2018 by Saurenergy The funds for Solar PV application implementation would be met from Plan allocation made during financial years 2018-19 onward with an overall Plan Outlay of Rs. 656 Crores. After the cabinet approved the continuation of Off-grid and Decentralized Solar PV Applications Programme – Phase III in financial year 2018-19, the President’s assent has deemed the continuation […] Read more
Nashik Municipal Corporation Buildings to get Solar Power Systems soon Updated On Fri, Aug 10th, 2018 by Saurenergy Nashik Municipal Corporation has already issued the letter of award to the contractor for installing solar panels at 16 government buildings. Under the ‘Smart City’ scheme, Nashik Municipal Corporation (NMC) approves the tender for installing rooftop solar panels at various government buildings. Moreover, NMC has already issued the letter of award to the contractor for […] Read more
Europe Develops Portable Solar ‘Plug and Play’ System under its ‘Horizon 2020’ Programme Updated On Thu, Aug 9th, 2018 by Saurenergy The developers claim the cost of energy produced by the portable solar generator to be half the cost of energy produced by diesel generators. European Commission regulated ‘Horizon 2020’ has developed a standalone, easy-to-install, photovoltaic generator, ‘SUNINBOX’, where all the equipment is configured in the factory ready for use as a portable ‘plug and play’ […] Read more
Introduction to Floating PV Plant Updated On Mon, Aug 6th, 2018 by Saurenergy Renewable energy sources are of prime importance as they would power our future. Solar energy power plant which utilises the sun’s energy needs adequate space for installation. It is a well-known fact that out of the 510 million Km2 surface area of earth, a mere (appx.) 29% is covered with land. Additionally (at some locations) […] Read more
SECI Rolls out Tender for 150 MW Solar PV Power Plant in Telangana Updated On Wed, Aug 1st, 2018 by Saurenergy The comprehensive tender includes design, engineering, supply, construction, erection, testing, commissioning and overall operations and management of the power project. Solar Energy Corporation of India (SECI) has rolled an e-tender for 150 MW solar PV power plant at various locations of PSU Singareni Collieries Company in Telangana state. SECI Tender will receive bids under domestic competitive […] Read more
ADB to Provide $45.4 Mn to Spur Off-Grid SPV Pumping for Irrigation in Bangladesh Updated On Sat, Jul 7th, 2018 by Saurenergy ADB grant will help in replacing diesel systems with solar powered irrigation to enhance energy security, reduce local pollution, and mitigate climate change. The project is also expected to result in a reduction of 17,261 tons of carbon dioxide emissions annually. The Asian Development Bank (ADB) will provide USD 20 million loan to Bangladesh […] Read more
260 KW Solar PV Plant to be Installed at Indore Railway Station Updated On Fri, Jun 22nd, 2018 by Saurenergy Indore railway station has already 20 KW capacity of a solar plant which saves around 5 percent of total electricity consumption of the station. In a major move to shift from conventional source of energy to green energy, Indian Railways have decided to install a mega solar power plant at Indore railway station. The station […] Read more
Cabinet Okays Continuation of Off-grid, Decentralised Solar PV Applications Programme Updated On Thu, Jun 7th, 2018 by Saurenergy The total project of the 3 components included under the phase-III is Rs 1,895 crore of which Rs 637 crore will be provided as central financial assistance. The government has provided its consent for implementing phase-III of off-grid and decentralized solar PV application programme to achieve additional 118 MWp (Mega Watt peak) off-grid solar PV […] Read more
Cabinet approves Continuation of Off-grid and Decentralised Solar PV Applications Programme – Phase III Updated On Wed, Jun 6th, 2018 by Saurenergy The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi has given its approval for implementation of Phase-Ill of Off-grid and Decentralised Solar PV (Photo Voltaic) Application Programme to achieve additional 118 MWp(Mega Watt peak) off-grid solar PV capacity by 2020. Phase-Ill of Off-grid and Decentralised Solar PV Application Programme covers […] Read more