SUBSCRIBE NEWS LETTER

land component

FTM Storage Costs to Decline 30% by 2025 in Asia Pacific: WoodMac

All-in FTM battery storage system costs in Asia Pacific markets could decline by more than 30 percent by 2025, as per Wood Mackenzie. All-in front-of-the-meter (FTM) battery storage system costs in Asia Pacific markets could decline by more than 30 percent by 2025, according to research and consultancy firm Wood Mackenzie. Storage system prices fell […]

Read more

CCEA Approves RCE for North Eastern Region Power System Improvement Project

The Cabinet Committee on Economic Affairs (CCEA) has approved the Revised Cost Estimate (RCE) of the North Eastern Region Power System Improvement Project (NERPSIP) at an estimated cost of Rs.6,700 crore. This is a major step, towards the economic development of the North Eastern Region through the strengthening of Intra-State Transmission and Distribution systems. Announced […]

Read more

MNRE Issues Guidelines For PM-KUSUM Scheme At Feeder Level

The Ministry of New and Renewable (MNRE), after consultation with state governments, has decided to issue Guidelines for Implementation of Feeder Level Solarisation under Component-C of PM-KUSUM Scheme. The Scheme consists of three components. Component-A includes installation of Decentralized Ground Mounted Grid Connected Renewable Power Plants, Component-B includes installation of standalone Solar Powered Agriculture Pumps […]

Read more

The Plan is to Power the Entire Agriculture Sector With Solar: RK Singh at RE-Invest

India’s plan is to rapidly take forward the idea of solarising its agriculture sector, and not just stop at solar pumps but cover the entire value chain. Agro-PV offers an opportunity to enable the achievement of both sustainable agriculture and clean energy transitions. Decentralised and distributed renewable energy solutions including solar-powered irrigation can significantly contribute […]

Read more

Key Solar Manufacturers Back 182mm Module Size for 2021

Three of the biggest module makers globally, Jinko, JA and Longi are betting that with their combined 54GW in capacity, the 182 mm module will face little headwinds to market acceptance in 2021.  The importance of standards, and standardisation in the solar sector can never be overemphasised, considering the multiple parts that have to work […]

Read more

With New Target Of 30.8 GW by 2022, Changes In KUSUM Scheme Follow

Close on the heels of a sanction from the President of India on expanding the scope of the PM KUSUM Scheme, the MNRE has come up with a fresh set of changes to the scheme, that will seek to enhance its reach and appeal to users. The changes, in quick succession, make it clear that […]

Read more

MePCDL issues EoI Tender for 10MW Solar Plant in Meghalaya

MePDCL has issued an EoI for the installation of Decentralized Grid Connected Ground/ Stilt Mounted Solar Based Power Plants in Meghalaya Meghalaya Power Distribution Corporation Limited (MePDCL) has issued an expression of interest (EoI) in the installation of Decentralized Grid Connected Ground/ Stilt Mounted Solar Based Power Plants of capacity 500 KW to 2 MW […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll