JSW Achieves 3.1 GW Of Locked-In RE Generation Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy Mumbai-based JSW Energy announced securing multiple renewable energy (RE) projects in the Commercial and Industrial (C&I) power market. With this latest project, JSW achieved a total locked-in power generation capacity of 20 GW. The company’s locked-in renewable energy (RE) C&I capacity now stands at 3.1 GW. This includes 2,654 MW of JSW group captive capacity […] Read more
Grid Study Engineer Updated On Fri, Dec 13th, 2024 by Saurenergy You will provide simulations and reports to SGRE’s Grid Engineer Managers, more specifically, your assignments will cover: Grid Code and Developer-requirement analysis. Modeling of Offshore Wind Farms; these models will be used to perform steady state, dynamic, transient and frequency domain simulations. Perform Steady State simulations to evaluate compliance to requirements related to: Short Circuit, […] Read more
Green Stocks Dec 13: Stocks Of Shakti Pumps Continue To Rise Updated On Fri, Dec 13th, 2024 by Saurenergy On a day when several green stocks fluctuated in the volatile share market, the stocks of Shakti Pumps continued to shine. The stocks of Indore-based solar pump company which witnessed a rise of 5% yesterday, reported another 5% surge in its stock price. Among all the green stocks we analyze daily, Shakti Pumps reported the […] Read more
Engineering Program Coordinator Updated On Fri, Dec 13th, 2024 by Saurenergy The Engineering Program Coordinator will be based in Hyderabad. In this position, you will report to the Senior Manager, Program Management. The candidate will work with mechanical engineering product development team to support program scope, schedule, and cost. They will be responsible for ensuring that program documentation and infrastructure are available for the cross functional […] Read more
Assistant Manager Engineering Program Management Updated On Fri, Dec 13th, 2024 by Saurenergy The Assistant Manager, Engineering Program Management will be based in Hyderabad. In this position, you will report to the Senior Manager, Program Management. The candidate will work with mechanical engineering product development team to manage program scope, schedule, and cost. He will be responsible for ensuring that program process is followed and cross functional support […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more
Premier Energies To Setup 1GW Of New Module Unit In Telangana Updated On Fri, Dec 13th, 2024 by Saurenergy Premier Energies today announced the approval of its Board for setting up a new 1 GW of new solar module unit. The new TOPCOn-based solar module factory has been planned at Maheeshwaram in Telangana. The Telangana-based solar module and cell maker informed about its latest move in its filings. The company spearheaded by Surender Pal […] Read more
Key Account Manager Sales – Grid Tie Inverter Updated On Fri, Dec 13th, 2024 by Saurenergy Build Vertical for Grid Tie Inverter Develop network of EPC partners/Distributors Drive Topline revenue, profitability and market share of Inverter Responsibilities:- Channel Sales Management, Distribution Network and EPC Handling Extensive experience in developing customer in C&I Segment Ability to network with large EPC customer. Understand the competition analysis with segment Trustworthy and hardworking, willing to […] Read more
Parliamentary Panel Bats For More Household Level Electrification Updated On Fri, Dec 13th, 2024 by Saurenergy A Parliamentary Standing Committee On Energy has now presented its first report of the panels. The panel in their key recommendations batted for the inclusion of more households for electrification. The panel was chaired by Lok Sabha MP Appa Barne. The panel also advocated for the use of more funds for the Scheduled Caste and […] Read more