EG Solwin, Welspun, NLC, & Adani Bag NTPC’s 1.2 GW Hybrid Projects Updated On Tue, Mar 18th, 2025 by Saurenergy NTPC has awarded 1.2 GW of wind-solar hybrid power projects to EG Solwin Renewable for 300 MW, Welspun Renewable Energy 250 MW project, NLC India 450 MW hybrid project, and Adani Renewable Energy secured 600 MW project. The tender allocated the project to EG Solwin, Welspun Renewable Energy, and NLC India at the lowest tariff […] Read more
AP Offers 25% Subsidy For Solar and Wind Energy Manufacturing Updated On Mon, Mar 17th, 2025 by Saurenergy Andhra Pradesh (AP) has released operational guidelines for implementing its clean energy policy. These guidelines cover key aspects such as approvals, resource allocation, land allotment, incentives, and statutory clearances. To streamline the approval process, NREDCAP will be required to create a Unified/Single Desk Portal. Through this portal, the government can allocate resources and facilitate the […] Read more
With 50 GW Additions, Solar Momentum Strong In US in 2024 Updated On Wed, Mar 12th, 2025 by Saurenergy The United States installed a record-breaking 50 gigawatts (GW) of new solar capacity in 2024, the largest single year of new capacity added to the grid by any energy technology in over two decades. According to the U.S. Solar Market Insight 2024 Year in Review report released by the Solar Energy Industries Association (SEIA) and Wood […] Read more
NHPC Discovers A Tariff Of Rs 3.41/kwh For 1.2 GW Hybrid Project Updated On Tue, Mar 11th, 2025 by Saurenergy Adani Green, Sprng Vayu Vidyut (Sprng Energy), Illuminate Hybrid (Mahindra Susten), and Avaada Energy have secured NHPC’s 1.2 GW wind-solar hybrid tender. NHPC had initiated the tender process to identify renewable energy developers for hybrid projects, strengthening its green portfolio. The tender was issued in January, and results were announced within two months. NHPC awarded […] Read more
Madhya Pradesh Issues PHS Policy To Add 12 GW Of 4-Hour ESS Updated On Tue, Mar 11th, 2025 by Saurenergy Madhya Pradesh requires 29,956 MW of solar and 5,293 MW of wind capacity by 2034-35 to meet its energy demand. Under the CEA’s resource adequacy plan for Madhya Pradesh, it projects a 5.36% compound annual growth rate (CAGR) in energy capacity from 2024-25 to 2034-35 to meet state power needs. Madhya Pradesh’s recent scheme for […] Read more
Corning, Suniva & Heliene Launch ‘Made in US’ Solar Production Updated On Mon, Mar 10th, 2025 by Saurenergy Suniva, a US-based manufacturer of monocrystalline silicon solar cells, and Heliene, a solar module manufacturer, have announced a deal with Corning Incorporated. The company claims this is one of the first ‘Made in America’ solar module supply chains. Under the agreement, the two companies will supply the domestic market with US-made polysilicon, wafers, and cells. […] Read more
Yogi Adityanath Inaugurates Avaada’s 1.5 GW Solar Module Facility In Gr. Noida Updated On Mon, Mar 10th, 2025 by Saurenergy Chief Minister of Uttar Pradesh, Yogi Adityanath inaugurated Avaada Group’s 1.5 GW Solar Module Manufacturing Gigafactory in Noida. Simultaneously, the foundation stone was laid for Avaada Electro’s ambitious 5 GW Integrated Solar Manufacturing Unit at Ecotech, Greater Noida. These milestone projects reaffirm Uttar Pradesh’s position as a key emerging hub for green energy and industrial growth. Avaada has […] Read more
Inox Wind Bags 153 MW Supply Order For Tamil Nadu Project Updated On Fri, Mar 7th, 2025 by Saurenergy Inox Wind Limited (IWL) has secured a 153 MW order from a leading renewable energy developer, which is part of a large global clean energy company. This order is for the supply of IWL’s 3 MW-class turbines for a project developed by a Tamil Nadu-based company. Additionally, IWL will provide limited-scope EPC services for the […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more