Mandatory Default Temp Setting at 24 degree C for ACs from Jan 1, 2020 Updated On Mon, Jan 6th, 2020 by Saurenergy The government has mandated the 24 degree celsius default setting of Air Conditioners (ACs) temperature by manufacturers from January 01, 2020. On October 30, 2019, the Central Government in consultation with the Bureau of Energy Efficiency (BEE) notified the new energy performance standards for Room Air Conditioners (RACs). The power ministry said in a statement […] Read more
Carbon Tax Waiver may put Renewables Growth in India at Risk: Fitch Updated On Mon, Jan 6th, 2020 by Saurenergy Fitch Solutions believes that the centre’s proposed carbon tax waiver on coal may pose substantial downside risks to India’s renewable sector growth. Fitch Solutions has said that it believes that the centre’s proposed carbon tax waiver on coal may pose substantial downside risks to India’s renewable sector growth. In a bid to alleviate significant debt levels in the power industry, India has proposed […] Read more
Siemens Gamesa Reaches €1.72 bn in Green Guarantee Lines in 2019 Updated On Sat, Jan 4th, 2020 by Saurenergy Siemens Gamesa has announced that in less than a year, and aligned to its commitment to sustainability it has accumulated €1.72 billion in green guarantee lines Siemens Gamesa recently extended a guarantee line from Danske Bank to EUR 150 million from an initial EUR 100 million and included Sustainable Development Goals (SDG) criteria. Likewise, the […] Read more
OPDEnergy Begins Operation of 50 MW Solar Plant in Spain Updated On Fri, Jan 3rd, 2020 by Saurenergy OPDEnergy has announced the completion of construction work on its new solar PV plant Zafra, located in Alcalá de Guadaira (Seville), Spain OPDEnergy, a company specialising in the development, financing, construction, and operation of renewable assets, has announced the completion of construction work on its new solar PV plant Zafra, located in Alcalá de Guadaira […] Read more
KCEC Comes Close to 100% Solar Goal With 2 new Arrays Operational Updated On Fri, Jan 3rd, 2020 by Saurenergy Two new solar arrays built by KCEC have come online, helping the group come closer to meeting its goal of 100 percent solar energy during the day by 2022 Two new solar arrays built by Kit Carson Electric Cooperative (KCEC) have come online, bringing three additional megawatts of solar power to KCEC’s customer base, which […] Read more
Tender Issued for Maintenance of 150 kW Rooftop Solar Plant at Pragati Maidan Updated On Fri, Jan 3rd, 2020 by Saurenergy ITPO has issued a tender for the annual comprehensive maintenance contract of 150 kW solar rooftop power plants at Pragati Maidan in New Delhi. The India Trade Promotion Organisation has issued a tender, inviting bids from specialised agencies dealing in the field of installation or maintenance of solar power plants for the annual comprehensive maintenance […] Read more
Ryder, ABB & In-Charge Unveil EV Charging Solution for Fleet Operators Updated On Fri, Jan 3rd, 2020 by Saurenergy Ryder System, In-Charge Energy, and ABB have jointly announced a first-of-its-kind partnership to provide EV charging infrastructure for fleet operators Ryder System, a leader in commercial fleet management, dedicated transportation, and supply chain solutions, In-Charge Energy, a privately-held energy solutions company based in California, and ABB, a global technology leader in electrification, have jointly announced a first-of-its-kind partnership to provide nationwide […] Read more
MNRE Drafts Scheme for Round-the-Clock Supply of Renewable Power Updated On Fri, Jan 3rd, 2020 by Saurenergy MNRE has issued a new draft policy for the supply of round-the-clock power from renewable energy projects, complemented with thermal power projects to Discoms The Ministry of New and Renewable Energy (MNRE) has issued a new draft policy for the supply of round-the-clock (RTC) power from renewable energy (solar, wind or small hydro) power projects. […] Read more
Installed Renewable Energy Capacity in India now at 84.39 GW: MNRE Updated On Thu, Jan 2nd, 2020 by Saurenergy The installed renewable energy capacity in India had crossed 84 GW mark by the end of November 2019, as per fresh data released by MNRE. The installed and operational renewable energy (RE) capacity in India had crossed 84 gigawatts (GW) mark by the end of November 2019, fresh data released by the Ministry of New […] Read more