PPA of 15 years Among Key Changes Proposed in TBCB Norms By India’s Power Ministry Updated On Tue, Oct 29th, 2024 by Saurenergy In Draft guidelines for Tariff based competitive bidding involving solar, wind, Hybrid, FDRE and Energy storage projects, India’s Ministry of Power has come out with a slew of proposed changes. The draft document has been released for feedback and suggestions, with a last day of submissions being 15 days from publishing of the guidelines, ie, […] Read more
Senior Mechanical PtX Engineer Updated On Mon, Oct 28th, 2024 by Saurenergy Your area of responsibility is as a senior advisor in mechanical equipment and engineering design, and you act as owner’s representative towards selected engineering companies and EPC contractors. You will lead the discipline through initial engineering phases to subsequent EPC execution. Your accountabilities are likely to vary, but your tasks may include: Leading the mechanical engineering […] Read more
Ramakrishna Forgings Invests Rs.12.90 Cr In Green Energy Deal With AMP Energy Updated On Mon, Oct 28th, 2024 by Saurenergy Ramakrishna Forgings, a metal forming company, recently made an investment of Rs. 12.90 crore in the form of equity and debentures in AMP Energy C&I Fifteen. The Kolkata-based company entered into Share Subscription and Shareholders Agreements, along with other relevant agreements, with the AMP Energy subsidiary for the procurement of solar power under a captive […] Read more
Assistant Manager – Supplier Quality (Electrical) Updated On Fri, Oct 25th, 2024 by Saurenergy Ensure timely completion of TER products. Responsible for reviewing supplier documents such as TTR (Type Test Reports) and packaging methods, etc. Responsible for review and approval of MQP (Manufacturing Quality Plan). Responsible for monitoring the quality of inspections. Ensure receipt of TPIA inspection reports, review reports, and provide technical clearance within TAT timelines. Ensure timely […] Read more
Senior Site Engineer -Solar Updated On Fri, Oct 25th, 2024 by Saurenergy Role & responsibilities:- Site Administrations as per corporate Guidelines / Follow ups with local authorities Viz: EB, Other Admin bodies. Benchmarking and Analysis of PIs such as Generation, losses, auxiliary power consumption, equipment availability, PR etc to maximize plant efficiency. Follow Up with Customer on JMR and Receivables. Monitoring and verifying proper Project Handover and […] Read more
Q2 Results: JSW Energy Reports Marginal Surge In Net Profits Updated On Fri, Oct 25th, 2024 by Saurenergy JSW Energy Limited today reported its results for the quarter (“Q2 FY25” or the “Quarter”) ended September 30, 2024. Key Highlights of Q2 FY25 Operational: Net Generation increased 14% YoY at 9.8 BUs driven by wind capacity additions, higher generation at thermal and hydro plants Total RE generation is up by 14% YoY at 5.0 […] Read more
ARENA Funds Australia’s First Community-Led Electrification Trial Updated On Thu, Oct 24th, 2024 by Saurenergy Australian Renewable Energy Agency (ARENA), and its partners Brighte, Rewiring Australia and Endeavour Energy, are set to electricity 500 households in New South Wales, in a new project announced recently announced by the organization. ARENA is providing $5.4 million in funding for the “Electrify 2515 Community Pilot” to support the electrification of 500 homes in […] Read more
JSW Energy Signs 700 MW Solar Power Agreement with SECI Updated On Wed, Oct 23rd, 2024 by Saurenergy JSW Renew Energy Eleven Limited, a subsidiary of JSW Energy Limited, has signed a Power Purchase Agreement (PPA) with Solar Energy Corporation of India Limited (SECI). The agreement covers the supply of 700 MW of solar energy through the Inter-State Transmission System (ISTS). This capacity was awarded under SECI’s Tranche XIII program. The power will […] Read more
Rajasthan’s New ‘RIPS’ Scheme Aims To Expedite RE Investments Updated On Wed, Oct 23rd, 2024 by Saurenergy In a pursuit to expand its renewable energy capacity, the Rajasthan government, released its Rajasthan Investment Promotion Scheme (RIPS). It intends to capitalize on an average of 300 to 325 sunny days each year with 24.22 GW solar energy and 5.19 GW wind energy. This scheme envisions to build on the state’s strengths in renewable […] Read more