229.25 RE Capacity Added in First 10 Months of FY21 in Andhra Pradesh Updated On Wed, Jan 20th, 2021 by Saurenergy Data from NREDCAP has revealed that in the first 10 months of the FY21, Andhra Pradesh had 229.25 MW of RE capacity connected to its grid. The New and Renewable Energy Development Corporation of AP (NREDCAP) has issued the updated status of renewable energy (RE) projects commissioned in the state of Andhra Pradesh (until January […] Read more
GE Renewable Energy scores another win in Vietnam Updated On Wed, Dec 30th, 2020 by Saurenergy GE Renewable Energy announced that it has secured a 27.2 MW contract to supply 8 units of GE’s 3 MW-137 wind turbines to support construction of the Phuoc Minh Wind Farm, located in Ninh Thuan, in the South Central Region of Vietnam. A consortium of PowerChina Huadong Engineering Corporation, Henste Engineering and IPC Group will […] Read more
SECI Closes 1.2 GW Hybrid Tender Issued in January, Lowest Bid at Rs 2.41/kWh Updated On Thu, Dec 24th, 2020 by Saurenergy SECI has finally closed its tender for setting up of a 1.2 GW hybrid projects in India with 3 firms submitting the lowest bid of Rs 2.41/kWh The Solar Energy Corporation of India (SECI) has finally closed its tender for setting up of a 1.2 GW ISTS-Connected solar-wind hybrid power projects in India under Tranche-III. […] Read more
Restrictive Banking Provisions aren’t Helping Renewable Adoption in India Updated On Mon, Sep 28th, 2020 by Saurenergy After restrictive net metering regulations and withdrawal of waivers for open access renewable projects, regulators are now restricting banking facilities. Banking is important as it provides renewable developers a mechanism to utilise their excess generation and avail financial benefits in some cases, states an analyst by JMK Research. In the last year, some renewable energy-rich […] Read more
BERC Issues Draft Regulations to Determine RE Tariffs Updated On Mon, Aug 24th, 2020 by Saurenergy Draft (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 is up for comments The Bihar Electricity Regulatory Commission (BERC) has issued Draft (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020. The draft is up for comments from stakeholders and interested parties up to September 25, 2020. BERC […] Read more
RERC Orders Firm to Pay Transmission, LPS and SLDC Charges Updated On Tue, Aug 4th, 2020 by Saurenergy Kishangarh Hi-Tech Textiles Park Ltd. has wind projects of 8.4 MW in Jaisalmer The Rajasthan Electricity Regulatory Commission (RERC) has ordered Kishangarh Hi-Tech Textiles Park Ltd. to pay transmission, state load dispatch center (SLDC) charges and late payment surcharge (LPS) to Rajasthan Vidyut Prasaran Nigam (RVPN). RVPN had petitioned the RERC requesting to provide relief […] Read more
Govt Urges Stakeholders to Contact Nodal Officer for Grievance Redressal on Pref to Make in India Order Updated On Mon, Jun 8th, 2020 by Saurenergy The Ministry of New & Renewable Energy (MNRE) has issued an office memorandum stating that for any grievance redressal purpose with respect to its order on ‘Preference to Make in India’, industry stakeholders can contact to the nodal officer. For this purpose, Sutapa Majumdar is the MNRE’s nodal officer for dealing grievances w.r.t. the matter. […] Read more
SECI to Hold Virtual Pre-Bid Meetings, Asks Stakeholders to Submit Queries Online Updated On Mon, May 18th, 2020 by Saurenergy SECI has issued two notifications regarding pre-bid and stakeholder consultation meetings for two of its active tenders for solar power projects in India The Solar Energy Corporation of India (SECI) has issued two notifications regarding pre-bid and stakeholder consultation meetings for two of its active tenders for 2000 MW solar energy projects (ISTS-IX) and the […] Read more
Top 10 States for Renewable Energy Installations in Last 4 Years Updated On Fri, May 15th, 2020 by Saurenergy A list of the top 10 states that have implemented the maximum amount of renewable energy projects in the last four years. As part of Intended Nationally Determined Contributions as per the Paris Accord on Climate Change, India has undertaken to install at least forty percent of its total electricity generation capacity from non-fossil fuel […] Read more