Green Stocks March 7: Wind Stocks Fly High Updated On Fri, Mar 7th, 2025 by Saurenergy On a day when the broader markets tended to trade with a negative bias most of the time. most of the green energy stocks did well to hold their own. While larger firms like Waaree Energies, Acme Solar, Premier Energies and NTPC Green gained, some like Adani Green, Tata Power continued to shed gains made […] Read more
All Women Team From Apraava Breaks New Ground By Running 100 MW Solar Plant Updated On Fri, Mar 7th, 2025 by Saurenergy In a significant stride towards advancing Diversity, Equity, and Inclusion (DEI), Apraava Energy put together an all women team to manage the morning shift operations at its 100 MW Veltoor solar plant in Telangana. The women did a more than competent job, driving home the possibility of more diversified hiring in the sector for other […] Read more
Sr Engineer-Coil Design Updated On Fri, Mar 7th, 2025 by Saurenergy We are seeking a skilled Coil Design Engineer to join our dynamic Engineering team. You will be responsible for Electromagnetic analysis & Coil design, Engineering calculations Responsibilities:- Understand the Project / Work Scope, plan and provide quality output to meet the encouraged schedule and timeline Periodic Interaction with Engineering Manager through Verbal & Written Communication […] Read more
Assistant Manager – Power & Water Solutions Updated On Fri, Mar 7th, 2025 by Saurenergy If you are an Engineering and Project Management professional, Emerson has an exciting opportunity for you! This Senior Project Manager role will handle Power and Water Solutions Control System and deliver projects on time and ensure meeting the customer requirements and Emerson important metrics. Responsibilities:- Accountable for overall Project Execution, Performance (Cost, Schedule, Quality and […] Read more
Assistant Manager- Module Process Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Responsible for improving lamination quality of the modules by meeting the lamination product /process CTQ’s. Stringer & laminator Recipe settings & troubleshooting. Documentation for new processes, WI, SOP, Process parameters Preparation of Pre lam EL data and rework monitoring and take corrective and preventative action for controlling Pre El rework. Coordinate with quality team […] Read more
PowerGrid Wins Bid For Andhra Pradesh Transmission Project Updated On Fri, Mar 7th, 2025 by Saurenergy Indian transmission company Power Grid Corporation of India Limited (POWERGRID) successfully bids for the Andhra Pradesh transmission project. This project is under Tariff Based Competitive Bidding to establish the Inter-State transmission system for the project namely “Transmission System Strengthening at Kurnool-III PS for Integration of Additional RE Generation Projects” on build, own, operate and transfer […] Read more
Production Engineer – Module Production Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Manpower allocation/ Ensure cleaning activity of critical machines/ 100% production adherence as per plan for respective shift 5S Activity / identify safety hazard and timely closure of Near miss/incident investigation if any. Communication with PPC team with respect to production order and RM Line in charge meeting with operator Defect discussion/production output Verification of […] Read more
Will Gensol Be Able To Drive Out of Latest Crisis? Updated On Fri, Mar 7th, 2025 by Saurenergy A downgrade by ratings agency ICRA has sent the Gensol Engineering stock on a tailspin, with the stock falling over 40% in the past four days. What’s behind Gensol Engineering’s massive stock crash? ICRA rating downgrade, governance concerns, and more Gensol Engineering, an Ahmedabad-based company engaged in solar EPC and EV leasing, had been a well […] Read more
Andhra Wins Over Premier Energies From Telangana With Plant Shift Updated On Fri, Mar 7th, 2025 by Saurenergy Premier Energies, a Hyderabad-based company, has decided to relocate its 4 GW Solar PV TOPCon cell manufacturing facility from Telangana to Andhra Pradesh. The company shared this update in its regulatory filing, stating, “For the implementation of the 4 GW Solar PV TOPCon Cell manufacturing, initially planned at UDL-5 Part in the Industrial Park, Seetharampur, […] Read more