Rayzon Was The Second Largest DCR Module Supplier in Residential Rooftop Solar in Gujarat Updated On Thu, Sep 29th, 2022 by Saurenergy While solar has incubated many startups, manufacturing startups are relatively rare in the sector, as manufacturing remains the toughest part of the chain. Rayzon Solar, the Gujarat based startup that started in 2017 with a 40 MW capacity has expanded to 1.5 GW since then, with plans to go all the way to 5 GW […] Read more
APDCL Invites Bids for Selection of Agency for Setting up MW Scale Solar Plant Updated On Tue, Sep 27th, 2022 by Saurenergy Assam Power Distribution Company Limited (APDCL) has invited bids for the eligible bidders/ firms/agencies to participate in the tender for the selection of an agency to carry out aerial topography survey with drone-based technology at the following project locations in the state of Assam for setting up of MW scale solar power plant. The last […] Read more
PTC India Invites EoI for 1000 MW Hybrid Energy Project Updated On Tue, Sep 27th, 2022 by Saurenergy Power Trading Corporation of India Ltd (PTC India) has invited Expression of Interest (EoI) for the procurement of 1000 MW hybrid energy project (solar & wind) phase-1 on a long-term basis. The last date for submitting the online bid is October 20, 2022. 500 MW capacity of this hybrid energy (Solar + Wind) tender will […] Read more
SECI Floats Tender for Rooftop Solar PV Projects on Govt Buildings Updated On Mon, Sep 26th, 2022 by Saurenergy Solar Energy Corporation of India Limited (SECI) has invited bids for the selection and empanelment of solar power developers for setting up grid-connected rooftop solar PV projects on government buildings under the RESCO model (Renewable Energy Service Company Model) through tariff-based competitive bidding. The last date to submit the bid is November 24, 2022, and […] Read more
SECI Invites Bids for 1 MW Grid Connected Rooftop Solar Plant at Port Blair Updated On Mon, Sep 26th, 2022 by Saurenergy Solar Energy Corporation of India Limited (SECI) has invited bids for a 1 MW grid-connected rooftop solar PV power project at Port Blair, Union Territory of Andaman & Nicobar, India. The last date to submit the bid is October 21, 2022, till 02:00 pm and the bids will be opened on the same day at […] Read more
KREDL Floats Tender for Acrylic Miniature Model of 2.05 GW Pavagada Solar Park Updated On Thu, Sep 22nd, 2022 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has invited online bids for the construction of a scale model (acrylic miniature model) of the 2050 MW (2.05 GW) Pavagada Solar Park in the new building complex in Nagarabhavi, Bengaluru. This model will be used to educate and inform participants in training and internship programs for skill development […] Read more
TSREDCO Floats 16 MW Grid Connected Rooftop Solar Tender in Hyderabad Updated On Tue, Sep 20th, 2022 by Saurenergy Telangana State Renewable Energy Development Corporation Ltd (TSREDCO) has invited a tender for 16MW grid connected (13 MW + 3 MW) & 14 MW (11MW + 3 MW) through captive mode + 2 MW net-metering mode) grid-connected rooftop solar systems on the cycling track for Hyderabad, Telangana under RESCO model and the global competitive bidding […] Read more
Tata Power RE, Three Other Firms Win GUVNL’s 750 MW Solar Project Updated On Tue, Sep 20th, 2022 by Saurenergy The 750 MW grid-connected solar project power purchase auction for Gujarat Urja Vikas Nigam (GUVNL) has concluded Solarcraft Power India, Solairedirect Energy, Tata Power Renewable Energy, and Utkrrisht Solar Energy as the winners. Solairedirect won 200 MW at Rs. 2.50/kWh, and Solarcraft earned 120 MW with a quote of Rs. 2.49/KW. 300 MW at a […] Read more
EESL Issues Tender for 24 MW Solar Module for Maharashtra Updated On Mon, Sep 19th, 2022 by Saurenergy A Joint Venture of NTPC Limited, Power Finance Corporation, REC and POWERGRID- Energy Efficiency Services Limited (EESL)- has floated a tender for 24 MW solar modules supply for Maharashtra. According to the tender document, all solar modules should be poly-crystalline & the capacity of all modules should be 330 WP or above. The modules are […] Read more