SECI Tenders for 5 MW Solar Power Plant at Tuticorin Port Updated On Wed, Jul 8th, 2020 by Saurenergy SECI has issued a tender for setting up a 5 MW grid-connected solar PV power plant at the V. O. Chidambaranar Port Trust (VOCPT) in Tuticorin, Tamil Nadu. The Solar Energy Corporation of India (SECI) has issued a tender, inviting bids from eligible firms for setting up a 5 MW grid-connected solar PV power plant […] Read more
Future of Residential Solar: Post Covid Period Updated On Thu, Jul 2nd, 2020 by Saurenergy Till Dec 2019, India was having 757 MW of cumulative installed solar capacity by the residential segment, out of 5440 MW of rooftop solar (RTS). As per Phase II of Grid connected RTS implementation plan by MNRE released in Aug 2019 last year, India has set for itself a modest and calculated target of 4GW […] Read more
MNRE Issues Guidelines for Wind Power Procurement from 2.5 GW ISTS Projects Updated On Fri, Jun 26th, 2020 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued guidelines for implementation of ‘scheme for a tariff-based competitive bidding process for procurement of renewable energy power from 2500 MW ISTS connected blended wind power projects’. The government has implemented the scheme for procurement of power at a tariff discovered via a transparent process of […] Read more
Cleaner air During Lockdown Helped Delhi Generate More Solar Power: Study Updated On Wed, Jun 24th, 2020 by Saurenergy Reduction in air pollution in Delhi due to lockdown may have led to more sunlight reaching solar panels, resulting in the production of more clean energy. Based on data collected in Delhi, a team of researchers – majorly from at the Massachusetts Institute of Technology (MIT) in Boston – report that the reduction in air pollution […] Read more
RK Singh Asks Discoms to Submit Monthly Report on Grid Connected Rooftop Solar Program Updated On Fri, Jun 19th, 2020 by Saurenergy The Power and New & Renewable Energy Minister RK Singh directed power distribution companies (Discoms) and State Nodal Agencies (SNAs) to submit the monthly status of implementation of grid-connected rooftop solar program. The move came in the backdrop as the Ministry of New and Renewable Energy (MNRE) is implementing phase-II of grid-connected rooftop solar programme […] Read more
MNRE Adds New Mode in ‘Solar Parks and Ultra Mega Solar Power Projects’ Development Scheme Updated On Fri, Jun 19th, 2020 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has introduced a new mode in its existing guidelines for the implementation of the scheme for the ‘Development of Solar Parks and Ultra Mega Solar Power Projects’. The move came in order to provide a further boost to the development of the renewable energy sector especially solar, […] Read more
CEL Again Tenders for Supply of BOS for Off Grid Solar Water Pumping System Updated On Tue, Jun 16th, 2020 by Saurenergy State-owned Central Electronics Ltd (CEL) has floated tender inviting online bids for the supply of balance of systems (BoS) for standalone off-grid solar photovoltaic (PV) water pumping systems in Madhya Pradesh (MP). The scope of the tender includes rate contract for design, manufacture, supply, erection, testing and commissioning of BOS for standalone off-grid solar PV […] Read more
SECI Issues RfS for Setting up of 10 MW Grid Connected Solar Plant in R’sthan Updated On Fri, Jun 12th, 2020 by Saurenergy State-owned Solar Energy Corporation of India (SECI) has issued a detailed RfS document for selection of solar power developers to set up a 10 MW grid-connected solar photovoltaic (PV) power plant at Bagru Kala town, near Chitroli village, Jaipur district, Rajasthan. Earlier, Saur Energy reported that the nodal agency had issued a notice inviting tender […] Read more
Andhra Govt Approves Proposal for 10 GW Mega Solar Project Updated On Fri, Jun 12th, 2020 by Saurenergy The Andhra Pradesh government has approved a proposal to set up a 10 GW mega solar power project to ensure uninterrupted supply to farmers during daytime The Andhra Pradesh government has approved a proposal to set up a 10 GW mega solar power project to ensure an uninterrupted 9-hour power supply to farmers during the daytime, besides […] Read more