The Triple Challenge Dragging Down Solar In India Updated On Fri, Aug 28th, 2020 by Saurenergy On August 21, the Central Electricity Authority (CEA), the premier national body tasked with laying down the roadmap to power for all citizens, and the policy interventions to get there, released a report on India’s solar and wind sector. Titled simply as “ Report of Under Construction Renewable Energy Projects”, the bland title laid bare […] Read more
India’s Stuttering Solar Progress Grinds To a Halt With COVID-19 Updated On Thu, Aug 20th, 2020 by Saurenergy Two latest reports by independent research agencies in the Indian renewable energy segment have revealed that the first half of the year (H1 2020) only saw a total of between 1 GW and 1.3 GW of new solar installations in India. While the full year installations expected to reach 3.5 GW (4.5 GW with rooftop) […] Read more
3 Firms Pitch for Equalisation Levy on Solar Equipment Supplies From SEZs Updated On Mon, Aug 10th, 2020 by Saurenergy A group of three domestic solar energy firms has pitched for an equalisation levy on solar equipment supplies from SEZs for domestic use A group of three domestic solar energy firms has pitched for an equalisation levy on solar equipment supplies from special economic zones (SEZs) for domestic use, so as to bring them at […] Read more
Indian Oil Tenders for 600 kW Solar Project in Haryana With Net-Metering Updated On Fri, Aug 7th, 2020 by Saurenergy Indian Oil has tendered for the EPC work on 600 kW solar power projects at the company’s LPG bottling plant in Karnal, Haryana with Net-Metering facility. The Indian Oil Corporation (IOCL) has issued a tender, inviting bids from eligible bidders to take up the Engineering, Procurement and Construction (EPC) work on setting up of 600 […] Read more
MoP Extends ISTS Charges Waiver for Solar & Wind Projects Until 2023 Updated On Fri, Aug 7th, 2020 by Saurenergy MoP has extended the waiver of ISTS charges and losses on the supply of power generated from solar and wind power projects until June 30, 2023. The Ministry of Power (MoP) has notified that it has extended the waiver of inter-state transmission system (ISTS) charges and losses on the supply of power generated from solar and wind […] Read more
COVID-19 Lowers Solar Equipment Imports by 83 Percent Updated On Wed, Aug 5th, 2020 by Saurenergy The COVID-19 pandemic has left a big mark on the Indian solar sectors’ imports from China, with imports during the first quarter down by over 83 percent. The COVID-19 pandemic has left a big mark on the Indian solar sectors’ imports from China, with data from the Ministry of Commerce suggesting that the Indian imports […] Read more
NOIDA Tenders for 10 MW Rooftop Solar Projects on RESCO Model Updated On Wed, Aug 5th, 2020 by Saurenergy The NOIDA Authority has issued a tender for the commissioning of rooftop solar projects worth 10 MW on the RESCO model at identified buildings The NOIDA (New Okhla Industrial Development Authority) Authority has issued a tender (RfP) for the commissioning of rooftop solar PV power projects worth 10 MW (ac) on the RESCO model at […] Read more
Indian Oil Tenders for 350 kW Solar Projects in Gurugram Plant Updated On Tue, Aug 4th, 2020 by Saurenergy Indian Oil has tendered for the engineering, procurement and construction of 350 kW solar power plants at its LPG bottling plant in Gurugram, Haryana. The Indian Oil Corporation (IOCL) has issued a tender for the engineering, procurement and construction (EPC) of 350 kW solar power plants at its LPG bottling plant in Gurugram, Haryana. The […] Read more
REIL Tenders for Manufacturing of 325Wp Poly Solar Modules Updated On Tue, Aug 4th, 2020 by Saurenergy REIL has tendered for the rate contract of manufacturing poly crystalline solar modules of 325Wp rated capacity from domestically manufactured solar cells. Rajasthan Electronics and Instruments Limited (REIL) has issued a tender for the rate contract of manufacturing poly crystalline solar module of 325Wp rated capacity. As per the tender, the modules are to be […] Read more