5 Big Hurdles that have Emerged for India’s Solar Power Producers Updated On Mon, Mar 11th, 2019 by Saurenergy After installations of almost 10 GW and above in 2017 and close to 8 GW in 2018, the solar sector is facing its biggest challenge yet, as hurdles have emerged for the continued growth of the sector. Some of these challenges were always there, they are only bigger now, while others have emerged with time. […] Read more
Indian Oil Issues Tender For 30 kW of Rooftop Solar Plants Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 14, 2019. The Indian Oil Corporation (IOCL) has issued a tender inviting online bids for deployment of 30 kWp on-grid Rooftop Solar Power Plant at (Corporation Owned Corporation Operated) COCOs at Chainage 101.200 km & 104.300 km at Agra- Lucknow Expressway under Agra DO and at COCO […] Read more
NTPC Invites Bids for 60 KW Rooftop Solar System at Farakka Plant Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 18, 2019, and the technical bids will open on March 19, 2019. The National Thermal Power Corporation (NTPC) has issued a tender inviting bids for setting up of 60 kWp (6 x 10 kW) rooftop solar systems at NTPC Farakka. The brief scope of work for the […] Read more
DEWA Issues RfQ For 900 MW Phase-V of MbRAM Solar Park Updated On Tue, Mar 5th, 2019 by Saurenergy The fifth phase of the project will use solar panels based on the IPP model and it will be commissioned in stages starting from Q2 of 2021. The Dubai Electricity and Water Authority (DEWA) has issued a Request for Qualification (RFQ) for developers to build and operate the fifth phase of the Mohammed bin Rashid […] Read more
Tender For 40 kW Rooftop Solar Plant at NIELIT Calicut Updated On Fri, Mar 1st, 2019 by Saurenergy The last date of bid submission is March 12, 2019. The National Institute of Electronics and Information Technology (NIELIT) Calicut, an autonomous scientific society of Ministry of Electronics & Information Technology, has issued a tender for setting up of a rooftop solar power plant on campus. The institute has invited bids from ANERT (Agency of […] Read more
Finance Ministry Imposes Anti-Dumping Duty on Textured Tempered Solar Glass From Malaysia Updated On Fri, Mar 1st, 2019 by Saurenergy The government has imposed an anti-dumping duty on import of tempered glass from Malaysia for a period of 5 years, considering the recommendations made by the DGTR. The Department of Revenue (DOR) under the Ministry of Finance has imposed an anti-dumping duty on the import of textured tempered coated and uncoated glass from Malaysia for […] Read more
NIT For 1200 MW Wind-Solar Hybrid Projects Tranche-II Updated On Thu, Feb 28th, 2019 by Saurenergy SBE Renewable and Mahoba Solar Private Limited were awarded a total 840 MW capacity of the tendered 1200 MW capacity of the Tranche-I tender. The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tenders (NIT) inviting online bids for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-II) on a […] Read more
DuPont, JinkoSolar Join Forces to Launch High-Efficiency Bifacial Module with Transparent Backsheet Updated On Thu, Feb 28th, 2019 by Saurenergy Further, this bifacial panel ‘Swan’ will be the latest addition to JinkoSolar’s Cheetah premium range. DuPont Photovoltaic Solutions, together with JinkoSolar Holding unveiled the new Jinko high-efficiency bifacial module “Swan” protected by clear DuPont™ Tedlar® PVF film-based backsheet. Further, this bifacial panel ‘Swan’ will be the latest addition to JinkoSolar’s Cheetah premium range. The company […] Read more
Risen Energy Begins Work on 117 MW Mexico Solar Project Updated On Wed, Feb 27th, 2019 by Saurenergy With a total installed capacity of 117MW, the facility is expected to supply 269,068 MWh of green electricity to Mexico annually. Chinese Solar Module Manufacturer, Risen Energy has initiated work on its 117 MW solar park in Mexico, the company has issued in a statement. This marks the solar panel maker’s formal entry into the build-out […] Read more