Engineer – Solar Performance Analysis Updated On Fri, May 14th, 2021 by Saurenergy Field Testing – Thermography, IV Curve tracing, Power Quality Analysis, EL Test, Flash test and all other Solar domain tests. Driving the organization wide automation of reports and KPIs. Wind Power curve analysis, Wind Resource estimation, Blade repairs, and Analytics. Remote monitoring of 100% of the plants. Benchmarking of Vendor performance – Service and Equipment […] Read more
Lead – Solar Performance Analysis Updated On Fri, May 14th, 2021 by Saurenergy We are looking for a dynamic and experienced team member to execute the data analysis and field-testing teams within Mahindra Teqo. We are looking for a candidate, who has deep appreciation of new technological developments, apart from working in teams and managing complex situations. The ideal candidate should have a proven track record of running […] Read more
Draughtsman for PV Solar Project (m/f/d) Updated On Wed, May 5th, 2021 by Saurenergy Responsibilities: Performing the following engineering functions including but not limited to Determination of work scope consolidate the design inputs. Assemble documents packages and develop drawing sets to be reviewed by engineer. Ensure to quantify factors affecting arrangement and installation of equipment and components. Preparation of in-house drawings and explain prepared drawings. Visit proposed installation sites […] Read more
Gautam Solar Installs Solar Pumps at 1000 Different Locations for Farmers in Haryana Updated On Tue, May 4th, 2021 by Saurenergy To reduce farmers’ reliance on diesel-based generators and make it easier for them to access electricity, Gautam Solar, one of India’s leading solar manufacturers, has installed solar pumps of 10 HP capacity at 1000 different locations in Haryana under the Pradhan Mantri Kusum Yojana. The government has set a target of installing 15,000 standalone solar […] Read more
Gautam Solar Increases Solar Manufacturing Capacity From 120 MW to 250 MW in India Updated On Fri, Apr 23rd, 2021 by Saurenergy Gautam Solar has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility in Haridwar. Gautam Solar, one of the leading solar manufacturers in the country, has announced that it has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility […] Read more
Solar O&M Gets Set For The Big League In India Updated On Mon, Apr 19th, 2021 by Saurenergy As India’s solar footprint has grown, from a tentative 3.7 GW in 2015 to over 40 GW now, a little appreciated, but growing opportunity is finally getting its place in the sun too. The Solar Operations and Maintainance (O&M) business. A $4 billion business worldwide in 2019, it is set to be a $9 billion […] Read more
Even As Solar Glass Prices Retreat, Price Pressures To Continue On Modules in 2021 Updated On Wed, Apr 7th, 2021 by Saurenergy The year 2020 was highly profitable for solar glass manufacturers everywhere. Not because they sold more, but because they could get much higher prices for their output. After being range bound for all of 2019 and right upto August 2020 between RMB 25-27 (1 RMB = Rs 11.3), solar glass prices shot up to a […] Read more
SunCable’s 14 GW Plan Inches Ahead With Move for Solar Mfg Plant in Darwin Updated On Tue, Apr 6th, 2021 by Saurenergy Sun Cable, the Singapore-based consortium handling the world’s largest electricity infrastructure project, aka the $22 billion Australia-ASEAN Power Link (AAPL), revealed this week that it had lodged an application with the Northern Territory’s Development Consent Authority for a facility in the region’s capital, Darwin. The said facility will manufacture Maverick solar array systems designed by […] Read more
Central Coalfields Tenders for 20 MW Solar Plant in Jharkhand Updated On Mon, Apr 5th, 2021 by Saurenergy Central Coalfields has issued a tender for the implementation of a 20 MW solar plant at the vacant land within piparwar MGR in Jharkhand. Central Coalfields Limited (CCL), a subsidiary of Coal India Limited, has issued a tender for the implementation of a 20 MW solar photovoltaic (SPV) power plant at the vacant land within […] Read more