Tata Power Solar Wins ₹632 Cr SECI Contract To Supply 292.5 MWp Solar Modules Updated On Thu, Feb 27th, 2025 by Saurenergy TP Solar Limited (TP Solar), a subsidiary of Tata Power Renewable Energy Limited (TPREL), has secured a contract from the Solar Energy Corporation of India Limited (SECI) to supply 292.5 MWp Domestic Content Requirement (DCR) Solar Modules. The project is awarded to TATA Power under the CPSU Scheme Tranche-III. The contract, valued at approximately ₹ […] Read more
Credence To Start Solar Cell Production From Rajkot Updated On Thu, Feb 27th, 2025 by Saurenergy Indian solar module manufacturer Credence Solar has announced plans to commence solar cell manufacturing from Rajkot in Gujarat. The company intends to establish a solar cell production line with a capacity of either 1 GW or 1.2 GW. The top management informed Saur Energy that the decision was made in response to the shortage of domestically produced […] Read more
JSW Energy Wins 125 MW/500 MWh BESS Tender From SECI At ₹441,000/MW/Month Updated On Thu, Feb 27th, 2025 by Saurenergy JSW Energy has recently secured a 125 MW/500 MWh standalone battery energy storage system (BESS) tender from the Solar Energy Corporation of India (SECI). JSW won the tender at ₹441,000/MW/month. SECI floated this tender in December 2024 and declared it within two months. As per the tender, SECI, after receiving interest from the Kerala State […] Read more
Adani Green Wins 1.25 GW Pumped Hydro Storage Project From UPPCL Updated On Thu, Feb 27th, 2025 by Saurenergy Adani Green Energy Limited (AGEL), has received a Letter of Award (LOA) from Uttar Pradesh Power Corporation Limited (UPPCL) for 1,250 MW of energy storage capacity from Pumped Hydro Storage Projects (PSP). The Panaura PSP project has a minimum commitment of 40 years. It will be located in Sonbhadra district, Uttar Pradesh, and is expected […] Read more
Adani Green Operationalize 67 MW Solar project At Khavda, Gujarat Updated On Tue, Feb 25th, 2025 by Saurenergy Adani Green Energy Twenty Six B Limited, a wholly owned step-down subsidiary of Adani Green, has operationalized a 67 MW solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,983.1 MW.” Projects In Khavda On The […] Read more
Senior Director, Engineering Updated On Tue, Feb 25th, 2025 by Saurenergy To achieve excellence in preventive maintenance programs at site with highest standards and ensure energy conservation practices. Assist the FM team in managing M&E scope of the projects to ensure the quality and deliverables with in the stipulated time. Assist in providing comprehensive facility, contract and procurement management for technical services to the client. Contribute […] Read more
Senior Analyst – Financial Risk Management & Compliance Updated On Tue, Feb 25th, 2025 by Saurenergy Duties & responsibilities:- Perform examination and review of financial records, reports, management controls, policies and practices affecting/reflecting the financial condition and operations results. Maintain effective communications with your Manager, members of the Client Finance team, and other members of the IAS team Capability to perform a review and interpret data to formulate a conclusion and […] Read more
ES Foundry to Supply 300MW of US-Made Solar Cells to Bila Solar Updated On Tue, Feb 25th, 2025 by Saurenergy ES Foundry, an American company advancing U.S. solar by onshoring crystalline solar cell production, today announced a multi-year agreement to supply 300 megawatts (MWs) of high-performance, U.S.-made solar cells to Bila Solar, a domestic solar module manufacturer. The solar cells will be made in Greenwood, South Carolina. This strategic partnership between ES Foundry and Bila […] Read more
Associate / Sr. Engineer Refrigeration Skid Design Engineer Updated On Tue, Feb 25th, 2025 by Saurenergy Responsibilities:- Design according to applicable GEA standards and/or customer specifications, in accordance with international and/or local regulations and directives. Develop custom made designs by using GEA standardized solutions. Study the design and set up of P&ID’s, create 3D drawings of the installation, calculation of the required materials (BOM) monitor and discuss the project design and project planning. […] Read more