HPERC Rolls Out Banking Regulation For Open Access Policy Updated On Fri, Dec 20th, 2024 by Saurenergy The Himachal Pradesh Electricity Regulatory Commission (HPERC) recently released an open access policy to allow connectivity and open access to electricity generated from green/renewable energy sources. It also includes energy generated from non-fossil-based waste-to-energy plants for use of the Intra-State Transmission System (InSTS) or the distribution system of the licensee(s) in the state or both. […] Read more
[VIDEO]: Gujarat To Host Highest No. Of Waste To Energy Plants Updated On Thu, Dec 19th, 2024 by Saurenergy The latest data from the Ministry of New and Renewable Energy (MNRE) indicates that Gujarat is poised to host the highest number of Waste-to-Energy (WTE) plants in India. This development comes as several states across the country increasingly adopt waste-to-energy solutions. MNRE classifies WTE plants as sources of renewable energy. Watch the full video to […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more
NHPC Floats 1.2 GW Wind-Solar Hybrid Tender With Greenshoe Option Updated On Wed, Dec 18th, 2024 by Saurenergy In a bid to procure hybrid power, NHPC recently floated a tender to supply 1,200 MW of power from wind-solar hybrid power projects, with a greenshoe option, The tender also said these projects could be established with or without Energy Storage Systems (ESS) anywhere in India. NHPC set 16th January 2025 as the last date […] Read more
Gujarat To Soon Host Highest No. Of Waste-To-Energy Plants Updated On Wed, Dec 18th, 2024 by Saurenergy The latest data from the Ministry of New and Renewable Energy (MNRE) indicates that Gujarat is poised to host the highest number of Waste-to-Energy (WTE) plants in India. This development comes as several states across the country increasingly adopt waste-to-energy solutions. MNRE classifies WTE plants as sources of renewable energy. At the national level, Delhi […] Read more
Senior Market Analyst – Energy Demand Updated On Tue, Dec 17th, 2024 by Saurenergy Working together with our global Commodities, Scenarios, Product, Technology and Consulting teams , this role will be responsible for building and maintaining new demand models across key sectors such as transportation, residential, commercial, industrials and transformation processes. You will support the development of both energy and/or material demand analysis and will own Wood Mackenzie’s proprietary […] Read more
Assistant Manager- Mechanical (Wind) Updated On Mon, Dec 16th, 2024 by Saurenergy Responsible of Overall erection and commissioning of Wind turbine in timely manner with required standard of Safety and quality at site. Erection and commissioning of Wind Turbine Logistic management and operation Crane and other resources Management Site coordination and management Quality and Safety at site Procurement Management Contractor Management Stakeholder Management Monitoring and controlling Responsibilities:- […] Read more
QA/QC Manager – Wind Towers Updated On Fri, Dec 13th, 2024 by Saurenergy Ensure and continuously improve quality of suppliers and their deliveries. Support and drive cross-functional cooperation with Procurement, Quality Management, Manufacturing and Logistics, R&D or/and Project Management (PM). Ensure compliance of SQM with applicable regulatory and quality requirements. A passion for renewable energy and a sense for the importance to lead the change. We are also […] Read more
Ambuja Cements Commissions 200 MW Solar Project At Khavda Updated On Fri, Dec 13th, 2024 by Saurenergy Ambuja Cements, a cement and building material company, today commissioned and began power transmission from its 200 MW solar power project in Khavda in Gujarat. The balance 806 MW capacity from this project is at various stages of commissioning and is expected to start transmitting in phases between March 2025 and June 2025. This development […] Read more