Global PV Cumulative Capacity Rose To 1.6 TW In 2023: IEA Updated On Wed, Apr 24th, 2024 by Saurenergy International Energy Agency’s International Power Photovoltaic System Program (IEA-PVPS) recent report found the global PV cumulative capacity grew to 1.6 TW in 2023. IEA-PVPS a collaborative R&D Agreements established within the IEA in its recent study showed, “1 581 GW of minimum installed cumulative capacity was installed by the end of 2023. At least 407.3 […] Read more
IEA’s PVPS Report 2024- Five Key Highlights Updated On Thu, Apr 18th, 2024 by Saurenergy The International Energy Agency’s PVPS program or Photovoltaic Power Systems Programme is promoting and facilitating the exchange and dissemination of information on the technical, economic, environmental and social aspects of PV power systems. it currently has 31 members, with India, and even the India backed International Solar Alliance (ISA), notable absentees. However, their 2024 report […] Read more
Move On Energy Commissions 650MW German PV Park Updated On Wed, Apr 10th, 2024 by Saurenergy German Solar developer Move On Energy has announced it has commenced commercial operation of Europe’s largest solar PV park in Germany. The solar plant is located in Leipzig, eastern Germany, the Witznitz Energy Park has a capacity of 605MW, with a further 45MW to be installed and connected by Summer. The project has been developed […] Read more
FIMER’s Made In India Inverters Shine In Key Indian PV Projects: KN Sreevatsa, MD Updated On Tue, Apr 9th, 2024 by Saurenergy 1.How was the year 2023 for FIMER in India In 2023, FIMER achieved a groundbreaking feat by securing its first major order of the year — a substantial 2.45 GW contract from a single client at a specific location in India. This was particularly significant as it involved the successful conclusion of the NTPC Phase […] Read more
To Meet AgriPV Capacity Of 20 GW In India By 2040, 1.1 Lakh Jobs To Be Created-Report Updated On Mon, Apr 8th, 2024 by Saurenergy India’s potential for Agri-Photovoltaic (APV) varies significantly across districts, ranging from 3,156 GW to 13,803 GW for various APV technologies according to recent report. In a report by the Fraunhofer Institute for Solar Energy Systems, EY, and CSTEP they projected APV capacity from 2024 to 2040, to achieve a cumulative addition of 20 GW and […] Read more
PVEL Is Now Kiwa PVEL After Formal Renaming Updated On Wed, Apr 3rd, 2024 by Saurenergy Netherlands-based Solar testing firm Kiwa Group has formally integrated three subsidiaries, PV Evolution Labs (PVEL), PI Berlin and Extel Energy, as integrated brands. The new entities will be called Kiwa PVEL, Kiwa PI Berlin and Kiwa ExTEL. As market leaders in the service of solar photovoltaic (PV) and energy storage projects, PVEL, PI Berlin, and […] Read more
SOFAR Brings PV & ESS Solutions At Solar Solutions 2024 Updated On Thu, Mar 21st, 2024 by Saurenergy Photovoltaic and Energy Storage System solutions company SOFAR presented its various products during the Solar Solution conclave 2024. SOFAR PowerMagic, a system crafted for C&I ESS, made a debut at the expo. It’s endowed with an efficient liquid cooling system and intelligent temperature control, promising unsurpassed cooling capabilities and energy efficiency. The modular design allows […] Read more
SECI Extends Bids For 900 Domestically Manufactured PV To 26 March Updated On Wed, Mar 13th, 2024 by Saurenergy Solar Energy Corporation of India (SECI) recently extended the bid submission deadline for the manufacturing, testing, packing forwarding, supply, and transportation of 900 MWp domestically manufactured solar PV modules with domestically manufactured solar cells. SECI revised the existing date and time for bid submission from 12th March at 2 pm to 26th March 2024 at […] Read more
SECI Invites Pre Bid For 900 MWp PV Modules & Cells Manufacturing In India Updated On Mon, Feb 26th, 2024 by Saurenergy Solar Energy Corporation of India (SECI) released a tender inviting bids for domestically manufactured solar PV modules with solar cells. The tender invited bids for domestic manufacturing, testing, packing and forwarding, supply, and transportation of the 900 MWp project. The document mentioned the pre-bid for the project to be placed at 11 am on 27th […] Read more