Syed Abbas, Head PV | Tmeic Industrial Systems India pvt Ltd. Updated On Thu, Apr 27th, 2017 by Saurenergy Read more
Edisun Microgrids Dual Axis PV Booster Tracker System Updated On Tue, Feb 28th, 2017 by Saurenergy Product Brief: PV Booster by Edisun Micro-grids is the only dual-axis solar tracker designed and built for the commercial rooftop and solar carport sector. Its direct drive design eliminates the need for a gearbox and the brushless DC motor has a 20 year life. PV Booster’s thoughtful implementation mitigates reliability concerns and yields an ultra-low-maintenance […] Read more
Yingli Leads the Development of the First Clean Production Evaluation System for China’s PV Industry Updated On Wed, Nov 23rd, 2016 by Saurenergy Yingli Green Energy Holding Company Ltd. today announced that The Clean Production Evaluation Index System for PV Cells (the “System”) was recently officially released by the National Development and Reform Commission (“NDRC”), Ministry of Environmental Protection, and the Ministry of Industry and Information Technology (“MIIT”). The System was jointly developed by China National Institute of […] Read more
Interview with Syed Abbas, Head PV, TMEIC Industrial Systems India Pvt LTD Updated On Fri, Sep 16th, 2016 by Saurenergy Toshiba-Mitsubishi Electric Industrial Systems Corporation (“TMEIC”) provides overall solutions voltage drivers, UPS systems and utility scale PV inverters. TMEIC India is the forerunner in business of sales, engineering, installation and servicing of industrial, electric and automation systems. TMEIC’s SolarWare inverters deliver high energy efficiency(98.7%),lower switching losses by 56%, lower equipment footprint and weight , thus […] Read more
SECI invites bids for 100 MW Grid PV project with Battery Energy Storage System in Kadapa Solar Park, AP Updated On Wed, Aug 10th, 2016 by Saurenergy Solar Energy Corporation of India Limited (SECI) is inviting bids for selection of Solar Power Developers for setting up of 100 MW Grid connected solar PV projects along with large scale battery energy storage system at Kadapa Solar Park, Andhra Pradesh. The tender come as part of National Solar Mission (NSM) Phase-II, Batch-IV. Interested bidders […] Read more
Phono Solar Announces Commissioning of PV Power Plant Outdoor Test System in Hainan, China Updated On Tue, Jul 5th, 2016 by Saurenergy Phono Solar has partnered with China National Electric Apparatus Research Institute (CEI) for outdoor test system in the extreme hydrothermal weather conditions of the Hainan Province. Phono Solar signed a five-year cooperation agreement with CEI. The agreement includes development of an outdoor PV power plant test area with supporting technical meteorological monitoring equipment. This 3KW […] Read more
Aurora announces sale of multiple Decima 3T Veritas Systems to major solar PV manufacturer Updated On Fri, May 20th, 2016 by Saurenergy Aurora Solar Technologies has announced the sale of two Decima 3T systems with Veritas Software for two new high efficiency cell production lines being built in Asia. The company notes that purchaser of its Decima 3T Veritas Systems is a leader in photovoltaic Industry that previously qualified the Aurora Decima system as offering significant performance […] Read more
Quality Head( PV module) Updated On Fri, May 9th, 2025 by Saurenergy This is a full-time on-site role for a Quality Head (PV module) at LOOM SOLAR. The Quality Head will be responsible for quality control, auditing, management, and assurance of PV modules. The role is based in Faridabad/Palwal and involves overseeing and ensuring the quality standards of solar products. Qualifications:- Quality Control, Quality Auditing, and Quality […] Read more
Mindra Starts Gigafactory In Gujarat For PV Inverters, EV Chargers Updated On Thu, May 8th, 2025 by Saurenergy Mindra Group, a firm specialising in the manufacturing of solar inverters and Electric Vehicle (EV) chargers, has started production from its new Gigafactory in Ahmedabad, Gujarat. The firm has now shifted all its manufacturing processes to the new production house in Gujarat. “On April 30, 2025, Mindra Group took a monumental step towards India’s electric […] Read more