MNRE Seeks Suggestions on Draft Guidelines For Installation of Solar Pumps/Plants By Farmers Updated On Wed, Mar 13th, 2019 by Saurenergy Stakeholders have until March 22, 2019, to send their comments/ suggestions/ views on the draft guidelines. The Ministry of New and Renewable Energy (MNRE) has issued a notice inviting suggestions and comments from stakeholders on the draft guidelines for implementation of the scheme for farmers for installation of solar pumps and grid-connected solar power plants. […] Read more
Maharashtra Issues Tender For 184 MW Solar Projects for AG Feeders Updated On Wed, Mar 13th, 2019 by Saurenergy The last date for bid submission is April 16, 2019. The Maharashtra State Power Generation Company Limited (MAHAGENCO) has issued a tender inviting online bids for the development of 184 MW of grid-interactive solar PV power plants at various locations in the state. The successful bidder will also have to provide operations and maintenance (O&M) for 25 […] Read more
Telangana Floats Tender For 31.12 MW of Rooftop Solar Projects Updated On Wed, Mar 13th, 2019 by Saurenergy The last date of bid submission is April 8, 2019. The Telangana State Renewable Energy Development Corporation (TSREDCO) has issued a tender for the development of 31.12 MW of grid-connected rooftop solar PV system scheme in Telangana under Net Metering or Captive through RESCO mode. The solar rooftop systems will be developed on vacant building […] Read more
CEL Issues Tender For 315 kW Solar Power Plant in Uttar Pradesh Updated On Wed, Mar 13th, 2019 by Saurenergy The last date of bid submission is March 22, 2019. The Central Electronics Limited (CEL) has issued a tender inviting online bids from eligible parties for the deployment of 315 kWp grid-connected solar PV power plant at its campus in Sahibabad, Uttar Pradesh. The brief scope of work for selected bidder(s) will include the design, […] Read more
Prez Sanctions Rs 11,814 Cr for Grid Connected Rooftop Solar Programme Phase-II Updated On Tue, Mar 12th, 2019 by Saurenergy However, the Ministry further added that the detailed operational guidelines for implementation of the scheme will be issued separately. The President of India has accorded for phase-II of grid-connected rooftop solar programme for achieving a cumulative capacity of 40 GW from Rooftop Solar (RTS) projects by 2022 with the total central financial support of Rs 11,814 […] Read more
Solar Tender For 60 MW Rooftop Projects Issued by REMCL Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is April 30, 2019. The Railway Energy Management Company Limited (REMCL), a joint venture of the Indian Railways and RITES Limited, has invited bids to set up total capacity of 60.17 MW of rooftop solar PV power projects on the rooftops of offices, buildings, and railway establishments across the zonal […] Read more
Indian Oil Issues Tender For 30 kW of Rooftop Solar Plants Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 14, 2019. The Indian Oil Corporation (IOCL) has issued a tender inviting online bids for deployment of 30 kWp on-grid Rooftop Solar Power Plant at (Corporation Owned Corporation Operated) COCOs at Chainage 101.200 km & 104.300 km at Agra- Lucknow Expressway under Agra DO and at COCO […] Read more
AAI Opens Tender For Engineering Consultancy For 6 MW Solar Plant at Kadapa Airport Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 20, 2019, and the bids will open on the same date. The Airport Authority of India (AAI) has issued a tender seeking engineering consultancy for the work of revision of 6 MW solar PV power plant at the Kadapa Airport in Chennai. The scope of work from […] Read more
NTPC Invites Bids for 60 KW Rooftop Solar System at Farakka Plant Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 18, 2019, and the technical bids will open on March 19, 2019. The National Thermal Power Corporation (NTPC) has issued a tender inviting bids for setting up of 60 kWp (6 x 10 kW) rooftop solar systems at NTPC Farakka. The brief scope of work for the […] Read more