HPCL Tenders for Off Grid Solar Plant in Jodhpur Updated On Fri, May 22nd, 2020 by Saurenergy Government-owned Maharatna company Hindustan Petroleum Corporation Ltd (HPCL) has floated tender inviting bids for the 7.5KW off-grid solar energy power plant in Jodhpur, Rajasthan. As per the tender details, the successful bidder will have to install 7.5KW ground-mounted off-grid solar power plant at COCO Pachpadhara Barmer under Jodhpur Retail regional office. The scope of work […] Read more
Railway Ministry Tenders for Supply of AURA Energy Solar Lights for Guwahati Updated On Thu, May 21st, 2020 by Saurenergy The Ministry of Railways, under the Government of India (GoI), has floated tender inviting bids from eligible bidders for the supply and commissioning of AURA Energy Solar light with battery backup and solar photovoltaic (SPV) panels for Guwahati location. As per the tender details, the scope of work includes “supply and commissioning of AURA Energy […] Read more
Indian Oil Tenders for Modification of Inverter Telemetry for Rooftop Solar Plants Updated On Thu, May 21st, 2020 by Saurenergy State-owned energy major Indian Oil Corporation Ltd has floated tender inviting electronic bids from eligible bidders for the modification of inverter telemetry for hosting of a real-time generation of rooftop solar plants of Western Region Pipelines (WRPL) on the common digital platform. The work location under the tender will be Indian Oil’s all locations of […] Read more
Tender Issued for Rooftop Solar Systems at Hubballi Dharwad Smart City Updated On Thu, May 21st, 2020 by Saurenergy Hubballi Dharwad Smart City Limited has issued a tender for rooftop solar PV systems worth approximately 340 kWp at government buildings under HDMC area The Hubballi Dharwad Smart City Limited (HDSCL), Karnataka has issued a tender for the commissioning of rooftop solar PV systems worth approximately 340 kWP on discount over retail tariff basis on […] Read more
Myanmar’s 1.06 GW Solar Tender – An Opportunity for Indian Developers Updated On Wed, May 20th, 2020 by Saurenergy The Ministry of Electricity and Energy (MOEE) of Myanmar has recently issued tender inviting bids from solar photovoltaic (PV) developers for the construction of multiple solar power plants across the country, with an aggregate 1.06 GW of capacity. Moreover, Myanmar’s Power Ministry is looking to build approx. 30 large-scale ground-mounted solar power plants with capacities […] Read more
MNRE Releases Draft Guidelines for Off-Grid Solar Plants; Seeks Stakeholders Comments Updated On Tue, May 19th, 2020 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has released the draft guidelines for implementation of off-grid solar power packs under RESCO mode and model PPA. Also, the notice calls upon industry stakeholders to provide their suggestions and comments on the draft guidelines and draft PPA latest by May 25, 2020. This is in line […] Read more
CEL Tenders for Supply of BOS for Off Grid Solar Water Pumping System in MP Updated On Mon, May 18th, 2020 by Saurenergy State-owned Central Electronics Ltd (CEL) has floated tender inviting online bids for the supply of balance of systems (BoS) for standalone off-grid solar photovoltaic (PV) water pumping systems in Madhya Pradesh (MP). The scope of the tender includes rate contract for design, manufacture, supply, erection, testing and commissioning of BOS for standalone off-grid solar PV […] Read more
Validity of Solar Project Tariffs Extended Until Sept 30 in Uttarakhand Updated On Sat, May 16th, 2020 by Saurenergy UERC has extended the validity for the benchmark capital cost and levelised generic tariff for solar power projects in Uttarakhand until September 30, 2020. The Uttarakhand Electricity Regulatory Commission (UERC) has published a new order extending the validity period for the benchmark capital cost and levelised generic tariff for solar power projects in the state […] Read more
Top 10 States for Renewable Energy Installations in Last 4 Years Updated On Fri, May 15th, 2020 by Saurenergy A list of the top 10 states that have implemented the maximum amount of renewable energy projects in the last four years. As part of Intended Nationally Determined Contributions as per the Paris Accord on Climate Change, India has undertaken to install at least forty percent of its total electricity generation capacity from non-fossil fuel […] Read more