EVs Buying Costs To Be At Par With Petrol Vehicles In A Year, Says Nitin Gadkari Updated On Mon, Jun 20th, 2022 by Saurenergy The Union Minister for Road Transport and Highways, Nitin Gadkari has expressed the hope in an event that the prices of all electric vehicles (EVs) are going to be equal to the cost of petrol vehicles in India in the coming one year. The premise behind the comment from the Union Minister is that, as […] Read more
Ireland Awards 414 MW Of Wind, 1534 MW Of Solar Projects At $101.80/MWh Updated On Fri, Jun 17th, 2022 by Saurenergy EirGrid, state-owned power grid of Ireland, has recently released the list of final bidders winning the auction of twin deployments – 414 MW onshore wind and 1534 MW solar – under the aegis of Renewable Electricity Support Scheme 2 (RESS 2). The auction put to rest the price bands as the average price of the […] Read more
NIWE E-tender for Hybrid Roof-Top 100 kW at Chennai, Tamil Nadu Updated On Fri, Jun 17th, 2022 by Saurenergy An independent R&D institution of MNRE, the National Institute of Wind Energy (NIWE) has floated a 100 KW tender for Hybrid Roof-Top at Chennai in Tamil Nadu. All the solar PV modules should be Monocrystalline (PERC) modules. Bids of this 100 Kw project will be opened on July 05, 2022, at 04:30 PM and the […] Read more
MoF Recommends 762 USD/MT, 908 USD/MT Anti-Dumping Duty On Fluoro Backsheets From China Updated On Fri, Jun 17th, 2022 by Saurenergy As part of the initiatives to protect the domestic industry, the Union Ministry Of Finance recommended on June 15 the imposition of anti-dumping duty on imports of Fluoro Backsheet excluding transparent backsheet, (FBETB) originating in or exported from China and imported into India. A polymer-based component used in the manufacture of solar modules, Fluoro Backsheet […] Read more
NTPC Limited Tender for 500 KW of PV Modules at Port Blair Updated On Fri, Jun 17th, 2022 by Saurenergy NTPC Limited has invited bids for solar PV modules for their solar project at A& N Islands in Port Blair. The total capacity of the project is 500KW. The last date to submit a proposal is 06th July 2022 The interested bidder has to pay INR 2,655.00 (inclusive of GST) as a tender fee to […] Read more
Australia Suspends Power Trading In Spot Markets Updated On Thu, Jun 16th, 2022 by Saurenergy In a move meant to cool down ever higher energy prices and ‘hoarding’ so to say the Australian Energy Market Operator (AEMO) has suspended the wholesale electricity spot market across all five participating NEM states in the country. AEMO’s notice states that even as it is shutting the market wef June 15, it has been […] Read more
US Automakers Want Congress To End Tax Credit Cap On Electric Vehicles Updated On Wed, Jun 15th, 2022 by Saurenergy The American electric vehicle manufacturers are devising means that could help the faster adoption of electric vehicles and seamless growth of the EV sector in the USA at a time when the European and Chinese electric vehicle markets are booming. In a fresh development, Chief Executive Officers of General Motors, Ford Motor, Stellantis and Toyota […] Read more
NTPC Has Floated 500 MW of BoS Tender for Solar Project in Rajasthan Updated On Wed, Jun 15th, 2022 by Saurenergy NTPC Renewable, the renewable focused arm of the power major, has floated a tender for the balance of system (BoS) package (excluding land and transmission system). This solar project has a total capacity of 500 MW and is for an STU-connected solar project in Bhadla, Rajasthan. It appears to be the tender one at a […] Read more
Disruptive Tech Trends Transforming The Shape Of EV Industry Updated On Tue, Jun 14th, 2022 by Saurenergy In 2020, before the pandemic shook up the world, especially the Indian automotive industry, electric vehicles were moving steadily into the spotlight. The total annual sales of different types of electric vehicles such as battery electric vehicles and hybrid electric vehicles in the year 2019 crossed over the two-million-vehicle mark. But even due to the […] Read more