Andhra Pradesh Releases New Wind-Solar Hybrid Policy Updated On Mon, Jan 7th, 2019 by Saurenergy The Government of Andhra Pradesh has set a target to achieve 18,000 MW of renewable energy capacity by the year 2021-22. Keen to harness the huge solar and wind potential of Andhra Pradesh, the state has launched its new ‘Andhra Pradesh Wind-Solar Hybrid Power Policy – 2018’. The Government of Andhra Pradesh has set a […] Read more
Sao Mai Group and HD Bank Sign Agreement for 210 MW Solar Park in Vietnam Updated On Fri, Jan 4th, 2019 by Saurenergy Sao Mai Solar PV1 is one of the largest scale projects in Southeast Asia built on an area of 275 hectares, with a capacity of 210 MW. One of the largest conglomerate in Vietnam, Sao Mai Group has signed an agreement with HD bank for the development of 210 MW capacity power plant in An […] Read more
CEL Issues Tender for 11 MW Solar Project in Maharashtra Updated On Thu, Jan 3rd, 2019 by Saurenergy The minimum size of a single project project has to be 400 KW to 500 Kw and the deadline for the submission of bid is January 14, 2019. The Central Electronics Limited (CEL) has issued a tender for the development of a 11 MW grid connected solar power plant in Maharashtra. The minimum size of […] Read more
West Bengal Issues Tender for 11 MW solar Energy Updated On Thu, Jan 3rd, 2019 by Saurenergy The project is for 900 grid connected solar rooftop power projects of 10 KW capacity and 100 units of 20 KW capacity at multiple locations. Increasing West Bengal’s share of solar power, West Bengal Renewable Energy Development Agency has issued a tender for the installation of 11 MW of solar power in the state. The […] Read more
PV System Commissioning – Perfection is The Key! Updated On Fri, Dec 28th, 2018 by Saurenergy Effective management of a solar PV plant could be divided into 3 distinctive steps i.e. Engineering Procurement & Construction (EPC), Commissioning and Operations & Management (O&M). EPC deals with the pre-construction and construction activities of the PV power plant. Commissioning is the process that starts along with the construction of plants and proceeds through PV […] Read more
Visakhapatnam Smart City Issues 15 MW Floating Solar Tender Updated On Wed, Dec 26th, 2018 by Saurenergy The project will be developed on Meghadri Gedda reservoir in Visakhapatnam district on a turnkey basis along with grid connecting equipment. Greater Visakhapatnam Smart City Corporation Ltd. has issued a tender for the installation of a 15 MW floating solar power plant in Visakhapatnam district. The project will be developed on Meghadri Gedda reservoir in […] Read more
MAHAGENCO Invites EoI for 10 MW floating Solar Project Updated On Mon, Dec 24th, 2018 by Saurenergy MAHAGENCO will enter a 25 year power purchase agreement with the developer and will provide the area at the reservoir. Maharashtra’s energy producer, Maharashtra State Power Generation Company (MAHAGENCO) has recently invited an expression of interest for the development of a 10 MW grid-connected floating solar power plant at the in Nashik district at Upper […] Read more
Centre Provided Rs 383 Cr to Madhya Pradesh Govt for Solar Projects Updated On Fri, Dec 21st, 2018 by Saurenergy Rs 70.03 crore were for the development of solar parks and ultra mega solar power projects and Rs 35 crore for solar rooftop schemes among others. The BJP-led central government assisted the Madhya Pradesh government with a funding Rs 382.91 crore over the financial year 2016-17 and 2017-18 for implementing projects and schemes in the […] Read more
JAKEDA Issues Tender for 5 MW Solar Project in J&K Updated On Fri, Dec 21st, 2018 by Saurenergy The last date for the submission of bids is January 14, 2019 and the time allotted to finish the project is 1 year from the date of issuance of the award. Jammu & Kashmir Energy Development Agency (JAKEDA) has invited bids for supply, installation and commissioning of grid interactive rooftop solar PV power plants of […] Read more