Adani Green Wins 1.25 GW Pumped Hydro Storage Project From UPPCL Updated On Thu, Feb 27th, 2025 by Saurenergy Adani Green Energy Limited (AGEL), has received a Letter of Award (LOA) from Uttar Pradesh Power Corporation Limited (UPPCL) for 1,250 MW of energy storage capacity from Pumped Hydro Storage Projects (PSP). The Panaura PSP project has a minimum commitment of 40 years. It will be located in Sonbhadra district, Uttar Pradesh, and is expected […] Read more
Climate Change vs Solar Energy: The Battle Within Updated On Wed, Feb 26th, 2025 by Saurenergy Decades ago, global warming and associated climate change had prompted the world to take some serious measures, such as curbing GHG emissions and trapping pollutants. Today, the surge of renewable energy, especially solar and wind energy, is now promising the sustainable future the world once dreamed about. However, climate change has also become profound, leading […] Read more
PM-KUSUM: Bhagyanagar Gets 53 MW Solar Project At ₹3.09/kWh Updated On Tue, Feb 25th, 2025 by Saurenergy Telangana-based Bhagyanagar India Limited has been awarded a Letter of Award (LOA) for a 53 MW solar pump project under the Mukhyamantri Saur Krushi Vahini Yojana 2.0. The company secured the project under feeder-level solarization under Component C of the PM-KUSUM Scheme. The company stated in a regulatory filing, “The company has received the project […] Read more
Adani Green Operationalize 67 MW Solar project At Khavda, Gujarat Updated On Tue, Feb 25th, 2025 by Saurenergy Adani Green Energy Twenty Six B Limited, a wholly owned step-down subsidiary of Adani Green, has operationalized a 67 MW solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,983.1 MW.” Projects In Khavda On The […] Read more
Principal Hydraulic Modelling Engineer/Associate (Wastewater) Updated On Tue, Feb 25th, 2025 by Saurenergy Responsibilities:- Working closely with the engineering teams on wastewater and drainage studies, from feasibility through to detailed design stages. Supervise Graduate Engineers on various wastewater network modelling projects in line with client requirement and reviewing/checking of their work. Setting the technical direction for modelling studies while liaising with lead business. Resolving technical modelling issues on […] Read more
Senior Analyst – Financial Risk Management & Compliance Updated On Tue, Feb 25th, 2025 by Saurenergy Duties & responsibilities:- Perform examination and review of financial records, reports, management controls, policies and practices affecting/reflecting the financial condition and operations results. Maintain effective communications with your Manager, members of the Client Finance team, and other members of the IAS team Capability to perform a review and interpret data to formulate a conclusion and […] Read more
ES Foundry to Supply 300MW of US-Made Solar Cells to Bila Solar Updated On Tue, Feb 25th, 2025 by Saurenergy ES Foundry, an American company advancing U.S. solar by onshoring crystalline solar cell production, today announced a multi-year agreement to supply 300 megawatts (MWs) of high-performance, U.S.-made solar cells to Bila Solar, a domestic solar module manufacturer. The solar cells will be made in Greenwood, South Carolina. This strategic partnership between ES Foundry and Bila […] Read more
Custom Duty Failed To Reduce Landed Price Of Solar Glass: Borosil Updated On Tue, Feb 25th, 2025 by Saurenergy Indian solar glass manufacturer Borosil Renewables claimed that the imposition of Customs Duty against the import of solar glass failed to reduce the burden of Indian solar glass makers. In the latest investor call, the top management of the firm said that blamed Chinese solar glass makers for reducing their solar glass prices, hurting the […] Read more
Associate / Sr. Engineer Refrigeration Skid Design Engineer Updated On Tue, Feb 25th, 2025 by Saurenergy Responsibilities:- Design according to applicable GEA standards and/or customer specifications, in accordance with international and/or local regulations and directives. Develop custom made designs by using GEA standardized solutions. Study the design and set up of P&ID’s, create 3D drawings of the installation, calculation of the required materials (BOM) monitor and discuss the project design and project planning. […] Read more