Tata Motors and Tata Power Continue Cooperation To Expand Solar Rooftop With 7 MWp Updated On Mon, May 23rd, 2022 by Saurenergy Continuing with the push towards sustainable manufacturing Tata Power and Tata Motors have joined hands for the development of a 7 MWp solar rooftop project at Tata Motors’ Passenger Vehicle Plant in Chikhali, Pune. This is the third phase of a joint 17 MWp on-site solar project developed by the two companies, of which a […] Read more
Engineering Assistant III Updated On Mon, May 23rd, 2022 by Saurenergy The main purpose of this position is to provide technical support to queries associated with ROV, Survey and AGV equipment. It includes Database Management using helpdesk and knowledge base softwares, assisting in troubleshooting using available resources and preparing customized reports for management. Duties & Responsibilities:- Functions:- ESSENTIAL:- Resolve queries associated with ROV, Survey and AGV […] Read more
Engineer-Substation Physical Design Updated On Mon, May 23rd, 2022 by Saurenergy Principal Duties and Responsibilities:- Proficiency with substation physical detailed design for utility substations 115kV and above (General Arrangement; Elevations and Sections; Equipment Specifications; Grounding; Lightning Protection; etc.); Knows how to use CDEGS (Grounding studies per IEEE80); Knows how to use CYME for underground cable ampacity cals; Knows how to do lightning protection per IEEE; Knows […] Read more
Buying An EV in India: Tax, Incentives, Rebates Updated On Mon, May 23rd, 2022 by Saurenergy Switch to EVs in India has become a necessity as the nation aims toward its goal of carbon neutrality by the year 2070, as announced at CoP26, 2021. The recent upsurge in fuel prices has also smoothened the road for EV’s. And helping it along is a slew of incentives from the government to help […] Read more
Canada Invests in Burchill Wind Project in Saint John Updated On Mon, May 23rd, 2022 by Saurenergy The Government of Canada is investing in renewable energy across the country and working with Indigenous partners to get major projects built. Wayne Long, Member of Parliament for Saint John–Rothesay, announced on behalf of the Minister of Natural Resources, nearly $50 million for the Burchill Wind Limited partnership between Wolumseket, owned by Neqotkuk and Natural […] Read more
NTPC commissions 35 MW Floating Solar Project in Kayamkulam Updated On Mon, May 23rd, 2022 by Saurenergy State owned power producer NTPC has announced that consequent upon successful commissioning, second part capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project at Kayamkulam, Kerala, is declared on commercial operation w.e.f. 06:00 Hrs. of 19 May 2022. As per the announcement, the first part capacity of 22 MW was already […] Read more
IREDA sanctions Rs 14,000 cr for RE projects in Maharashtra Updated On Mon, May 23rd, 2022 by Saurenergy Renewable energy projects finance company and government owned – Indian Renewable Energy Development Agency Limited (IREDA) – has announced that it has sanctioned loans of Rs 14,445 crore and has already disbursed more than Rs 10,000 crore in Maharashtra for renewable energy projects. IREDA and Mahratta Chamber of Commerce Industries and Agriculture (MCCAI) conducted a […] Read more
NTPC Q4, Fy 21-22 Results-Strong Show, But Slow Going On Renewable Capacity Plans Updated On Sat, May 21st, 2022 by Saurenergy The Country’s largest power generator- NTPC Ltd., with a present group installed capacity of 68,982 MW, declared the financial results for FY22 on 20 May 2022. NTPC Group generated 361 Billion Units and recorded highest ever annual generation in FY22 as compared to 314 Billion Units in FY21, an increase of ~15%. NTPC’s standalone gross […] Read more
APAC Infrastructure Engineer Updated On Fri, May 20th, 2022 by Saurenergy The role is to manage and deliver a robust, reliable and highly available infrastructure ensuring cost effectiveness and quality. This includes:- Develop standards and document processes and procedures for all aspects of the infrastructure. Ensure all SLAs are met measuring daily, weekly and monthly KPIs. Governance and management of vendors to ensure timely responses, project […] Read more