IKEA to install Tennessee’s largest solar rooftop array on its Memphis store Updated On Sat, May 14th, 2016 by Saurenergy Swedish home furnishing retailer, IKEA has announced plans to install a solar energy system atop its Memphis store opening late Fall 2016. It is said be the largest rooftop solar array in the State of Tennessee. The 271,000 square-foot future IKEA Memphis, including approximately 800 parking spaces, will be built on 35 acres in the […] Read more
Canadian Northern Territory aims to Operate Completely on Solar Updated On Mon, Feb 22nd, 2016 by Saurenergy Canada is in vigorous search for alternatives sources to deviate itself from fossils fuels. Colville Lake situated in the Sahtu Region of the Northwest Territories of Canada is known to have successfully prototyped a system of batteries and solar panels that will leverage the entire community to run on sun’s energy; at least in the […] Read more
Demystifying Renewable Energy and Its Process Updated On Wed, Dec 16th, 2015 by Saurenergy The energy which are captured from existing streams of energy like on-going normal procedures for example, daylight, wind, streaming water, natural procedures (natural processes) and geothermal heat streams are the renewable energy (sources) or RES. The known definition is that renewable energy is from an energy asset that is supplanted quickly by a characteristic process, […] Read more
Lead Engineer – Mechanical Components Updated On Mon, Mar 3rd, 2025 by Saurenergy The Lead Engineer – Mechanical Engineering position is in Large Structures team within Onshore Wind Machine Head Engineering Subsection. The team provides full lifecycle ownership and support for mechanical hardware (Bedplate castings, Low speed Rotor lock and Shipping fixtures etc) including New Product/Technology Introduction, Validation & Testing, Field Support and Root Cause Analysis. The Lead […] Read more
Tata Steel Using Multiple Options To Boost Use Of RE: Probal Ghosh Updated On Tue, Oct 15th, 2024 by Saurenergy 1. What are the major works you are doing towards shifting to renewable energy for your operations? Integrated Steel plants are power intensive and require huge quantum of power. Currently, the standard BF-BOF route of making steel is in operation and the by-product gases generated in the process are utilised for meeting many heating purposes […] Read more
IBM Acquires Prescinto, Expands Into Renewable Energy Space Updated On Tue, Oct 15th, 2024 by Saurenergy IBM acquires Digital Renewables company – Prescinto, an asset performance management (APM) and a software-as-a-service (SaaS) provider. This acquisition will allow Prescinto leverage artificial intelligence (AI) to enable monitoring, analytics, and automation to streamline renewable energy operations and manage clean energy and storage assets. The Bangalore-based digital company offers solution to organizations that are increasingly […] Read more
Himachal Pradesh To Invest In Pumped Storage projects Updated On Wed, Sep 25th, 2024 by Saurenergy Himachal Pradesh Chief Minister, Thakur Sukhvinder Singh Sukhu said the State has decided to enter the sector of Pumped Storage Projects (PSPs). He said that PSPs are considered one of the most dependable mechanisms towards a balanced supply of power from renewable sources like solar and wind energy. Himachal has been the leader in mini-hydel […] Read more
Senvion Secures 86.4 MW Order From Continuum Green Energy Updated On Thu, Aug 29th, 2024 by Saurenergy Wind turbine manufacturer Senvion India announced a new order of 86.4 MW from Continuum Green Energy in Gujarat. With this order, Senvion will be delivering a total of 270 MW across five projects to Continuum. Senvion India was acquired by Saudi Arabia based Alfanar in 2021 from its German parent, Senvion Gmbh. At the time […] Read more
SECI Issued 8.4 GW Green Project Tenders In 2023-24: Data Updated On Tue, Aug 6th, 2024 by Saurenergy The Solar Energy Corporation of India Limited (SECI) in its recent statement said that it has been able to issue renewable energy tenders of upto 8440 MW in 2023-24. The central tendering authority recently talked about its annual performance in the last fiscal year. It also declared financial results of the company. “In FY24, SECI […] Read more