DCS System Engineer / Sr. System Engineer Updated On Mon, Jan 20th, 2025 by Saurenergy If you are a Distributed Control System professional, Emerson has an exciting role for you! We are looking for a DCS System Engineer / Senior System Engineer to work with our Pune Centre of Excellence engineering team. This role will work independently and as a part of a team to design, implement and test DCS […] Read more
JA Solar To Supply Africa’s Largest PV-Storage Project Updated On Mon, Jan 20th, 2025 by Saurenergy JA Solar has signed a 1.25GW module procurement agreement with China Energy Engineering Corporation (CEEC). The agreement secures JA Solar as the exclusive supplier of high-efficiency n-type photovoltaic (PV) modules for the Abydos Phase II 1GW+600MWh PV-Storage Project, the largest of its kind in Africa, developed by AMEA Power and constructed by CEEC. The signing […] Read more
Senior Design Engineer / Assistant Manager-Design Updated On Mon, Jan 20th, 2025 by Saurenergy If you are looking for an opportunity in Engineering, Emerson has this exciting role for you! The Senior design engineer / Assistant Manager will be responsible to lead the solutions design – Panels/Cabinets selection, Schematic & proposal – design & drawings, bill of materials finalization, execution support. Responsibilities:- To understand customer circuits/requirements and prepare assembly […] Read more
Green Stocks January 20- Mixed Day for Green Stocks As Trump Impact Looms Updated On Mon, Jan 20th, 2025 by Saurenergy Green energy stocks had a mixed day today as the market looks for cues from the incoming Trump administration. While everyone is hopeful that the new President will continue to blow hot and cold but look for ‘deals’ eventually, worries on India’s solar exports do not seem to be top of the mind, going by […] Read more
Himachal Pradesh: Dharamshala Gets Its First Solar Project Updated On Mon, Jan 20th, 2025 by Saurenergy Himachal Pradesh (HP) Chief Minister Thakur Sukhvinder Singh Sukhu recently inaugurated its first solar power project 750 kilowatts at Dharamshala in Kangra district. The solar project was built at Rs. 4.74 crore and spans 8,500 square meters of land. The project would generate approximately 2,000 units of electricity daily, yielding a monthly income of Rs. […] Read more
Exicom Optimistic For Its Integrated BESS & Charger Unit Updated On Mon, Jan 20th, 2025 by Saurenergy Exicom, a leading Electric Vehicle (EV) charging and critical power solutions company, is optimistic about its integrated Battery Energy Storage System (BESS) and charging pump offering. The company recently showcased its new integrated system design at the Bharat Mobility Expo. Top management told Saur Energy that the unit can seamlessly connect with both off-grid solar […] Read more
GUVNL Issues 250 MW Wind Energy Tender With Greenshoe Option Updated On Mon, Jan 20th, 2025 by Saurenergy GUVNL recently issued a 250 MW grid-connected wind power project tender to be set up anywhere in India (Phase IX). The project also offers an additional ‘Greenshoe Option’ of up to 250 MW. It’s inviting bids up till February 11, 2025. The successful bidder under this arrangement can also consider entering into a Power Purchase […] Read more
NHPC Issues Tranche-I 125 MW/500 MWh BESS Tender In Kerala Updated On Mon, Jan 20th, 2025 by Saurenergy NHPC has released a tender to build a battery energy storage system (BESS) to select developers for setting up 125 MW / 500 MWh (InSTS) connected standalone BESS (NHPC-Tranche-I-BESS). The project would be located in Kerala with viability gap funding (VGF) support (2024-25). NHPC has sought bids until February 21, 2025. The NHPC tender explained, […] Read more
Waaree RTL Gets 105 MWp Ground-Mount Solar Project For Rs. 277.20 Cr. Updated On Mon, Jan 20th, 2025 by Saurenergy Mumbai-based solar EPC company, Waaree Renewable Technologies Limited has secured a 105 MWp ground-mount solar power project. The company secured approximately Rs. 277.20 Crores (Excl. Taxes) order. The company said in the regulatory filing “The project is scheduled to be completed in the financial year 2025- 26, as per the terms of the order.” The […] Read more