Principal Engineer Power System Studies Updated On Thu, Jun 13th, 2024 by Saurenergy We are looking for highly experienced engineers for a senior role in ‘Power System Study’ discipline, as we look to grow the team in line with business requirements. So, if you are interested in working for an internationally renowned consultancy and working on some of the challenging projects across USA come and join us at […] Read more
Khavda RE Park Gets A Boost With Green Transmission Line Updated On Tue, Jun 11th, 2024 by Saurenergy India’s ambitious Khavda Renewable Park in Gujarat has now got an impetus with a dedicated transmission line to evacuate 7 GW of renewable power. This comes after the Khavda-Bhuj Transmission Limited (KBTL) received the central power regulator nod to proceed ahead to establish the dedicated renewable evacuation line. KBTL had earlier approached the Central Electricity […] Read more
Green Financing A Boon For Clean Transmission Projects: Sharib Razi Updated On Fri, May 31st, 2024 by Saurenergy What are the challenges faced by the grid, when it comes to a higher share of renewable energy? Razi: There are two major challenges with increasing share of renewables in the grid. Firstly, due to the intermittent nature of renewable energy, the peak generation of solar or wind does not coincide with the peak load […] Read more
Hitachi’s Transmission Project Stabilizes RE Supply To Australian Power Grid Updated On Fri, May 24th, 2024 by Saurenergy Switzerland-based Hitachi Energy was recently selected by Marinus Link Pty Ltd (MLPL), jointly owned by the Australian, Tasmanian, and Victorian governments to supply a high-voltage direct current (HVDC) project. This project is expected to augment the connection between mainland Australia and Tasmania’s grid. The transmission project is an approximately 345-kilometer cable route HVDC system and […] Read more
Senior HV Engineer – Solar Systems Specialist Updated On Wed, May 15th, 2024 by Saurenergy Responsibilities:- Electrical System Design: Design of electrical power system for Solar PV projects ranging from LV to HV AC – including but not limited to – power evacuation SLD, transformer sizing, conductor sizing, switch gear and protection system design, transmission line design. Equipment Sizing & selection: Determine the appropriate sizing of electrical equipments, including but […] Read more
Hitachi Energy Inks 3.5 GW Wind Power Transmission Deal In US Updated On Wed, May 15th, 2024 by Saurenergy Hitachi Energy announced that it has signed a multi-year agreement with Pattern Energy to support its high-voltage direct current (HVDC) technologies for the SunZia Transmission Project. The link will connect the 3,515-megawatt (MW) SunZia Wind project in New Mexico to Arizona and Western states, which will be one of the world’s largest transmission links delivering […] Read more
MPERC Introduces Policy For Grid Interactive Renewable Energy System Updated On Wed, Apr 3rd, 2024 by Saurenergy Madhya Pradesh regulatory body Madhya Pradesh Electricity Regulatory Commission (MPERC) introduced general conditions for net metering, group net metering, and virtual net metering, through distributed licensees to eligible consumers on a first come first serve basis. The regulation extended to the whole of Madhya Pradesh and applied only to the Captive Power Plants (CPP) using […] Read more
IndiGrid Operationalises First Transmission project Updated On Tue, Apr 2nd, 2024 by Saurenergy KKR backed IndiGrid, India’s first and largest listed power sector infrastructure investment trust (InvIT), has announced the successful operationalisation of its first greenfield project – Kallam Transmission Limited (KTL) – at Beed, Maharashtra. The project was won by IndiGrid in December 2021 through the Tariff Based Competitive Bidding (TBCB) mechanism and has been developed on […] Read more
CERC Grants Transmission License For Bikaner-III Neemrana Transmission Project Updated On Fri, Mar 22nd, 2024 by Saurenergy The Petitioner, Bikaner III Neemrana Transmission Limited (BNTL) has filed the present Petition for the grant of a transmission licence under Sections 14 and 15 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) read with the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related […] Read more