HPCL Tender Seeks Developer for 78 MW Renewable Energy Updated On Fri, Nov 24th, 2023 by Saurenergy Hindustan Petroleum Corporation Limited has issued a tender for the supply of 78 MW of renewable energy under long-term open access from projects located anywhere in India. The developer selected in the HPCL tender will be responsible for supplying power to HPCL’s refinery in Mumbai. The last day for the submission of bids for the […] Read more
NTPC REL Floats Tender for BOS Package of 1110 MW Wind Project Updated On Thu, Nov 23rd, 2023 by Saurenergy NTPC REL invites online bids for BOS package of ISTS connected wind energy project with nominal capacity of 1110 MW capacity anywhere in Gujarat under Tranche II. The last date and time for receipt of bids comprising both techno-commercial bid and price bid is December 20, 2023. The techno-commercial bid opens on the same day, […] Read more
Project Engineer Electro Mechanical Updated On Fri, Nov 17th, 2023 by Saurenergy Technical Project Engineering focuses on a range of engineering disciplines e.g. electrical, mechanical, chemical, civil, structural, automation and software engineering. The activities associated with project engineering include discipline engineering and design; planning, risk assessments; coordination of resources (personnel and equipment). Responsibilities:- Preparation of PQS Plant Layout (Yard Arrangement – Layout & Plan, Electrical HV / […] Read more
RECPDCL Issues Request for Proposal For 1 GW Renewable Energy Updated On Fri, Nov 17th, 2023 by Saurenergy REC Power Development & Consultancy Limited has issued a Request for Proposal for the selection a transmission service provider through tariff based competitive bidding process to establish Inter-State Transmission system for transmission system for evacuation of power from renewable energy projects for 1000 MW in Rajgarh SEZ in Madhya Pradesh-Phase II. The last day to […] Read more
Indore-Based EKI Power Gets Nod For ISTS Power Trading Licence Updated On Wed, Nov 15th, 2023 by Saurenergy Indore-based EKI Power Trading Limited today received approval for a licence from the Central Electricity Regulatory Commission (CERC) for commencing transmission of power under the Inter-State Transmission System (ISTS). The decision from the central commission came when the firm moved the CERC seeking its approval for a licence of electricity transmission. The company was incorporated […] Read more
World Bank Backs Himachal Power Sector with USD 200mn Updated On Wed, Nov 8th, 2023 by Saurenergy The Government of Himachal Pradesh and the World Bank have joined hands for a project valued at USD 200 million to enhance power sector reforms in the state. The project aspires to augment the share of renewable energy (RE) in the power mix of Himachal Pradesh, which has set sights on adding 10,000 MW of […] Read more
Winning Bid In 1.5 GW SJVN Tender with Storage At INR 4.38 per Kwh Updated On Wed, Nov 8th, 2023 by Saurenergy In the 1500 MW SJVN solar tender for ISTS connected renewable energy project that comes with storage pan India, Juniper Green Energy, Tata Power Renewable Energy, ACME Cleantech Solutions, Solarcraft Power India, Hero Solar Energy, TEQ Green Power XVI, ReNew Solar Power have emerged as winners. SJVN is a public sector undertaking. ACME bagged the […] Read more
Avaada Bags 1 GW in NHPC 3 GW Solar Tender; Jakson, Sprng Energy, Hinduja Among Other Winners Updated On Tue, Nov 7th, 2023 by Saurenergy In NHPC’s 3 GW tender for the selection of Solar Power Developer, Avaada Energy, Jakson, Sprng Energy, Hinduja Renewable Energy, Green Infra Wind Energy, Solairdirect Energy India, Hazel Hybren have emerged winners. Solairdirect Energy India is an arm of ENGIE, Green Infra Wind Energy and Hazel Hybren are subsidiaries of Sembcorp and Mahindra respectively. Avaada […] Read more
Will Start Indian Manufacturing Unit Soon: Kumar Shailendra, Sol Bright Updated On Tue, Oct 31st, 2023 by Saurenergy How much technological progress has the firm made since 2013? In the sector of dry cleaning robots, we are the inventors of this technology. Around 2013, we invested in this technology. From 2013 to 2023, we moved from Gen-I robots to Gen-VI robots. Now, we are offering Gen-VI robots. It resulted from the experiences and […] Read more