ReNew Inaugurates 1.3 GWp Rajasthan Solar Project Updated On Fri, Apr 18th, 2025 by Saurenergy ReNew, has inaugurated its 1.3 GWp capacity solar project in Jaisalmer, Rajasthan, Unveiled by the Minister of New and Renewable Energy, and Minister of Consumer Affairs, Food and Public Distribution, Pralhad Joshi, in the presence of the Rajasthan Chief Minister, Bhajan Lal Sharma. This project uses 100% Made-by-ReNew solar panels, with 90% manufactured in Rajasthan […] Read more
Update: Rayzon Solar’s Pre IPO Round Attracts $16.2 Million Updated On Fri, Apr 18th, 2025 by Saurenergy An earlier version of this story mentioned Sachin Tendulkar as an investor in Rayzon Solar’s maiden funding round, based on details from the company’s regulatory filing (MGT-14). However, the latest filing (PAS-3) does not show any share allotment to Tendulkar. Accordingly, we have updated the story and removed his name. Solar panel manufacturer Rayzon Solar […] Read more
We Aim To Make Solar Biz Simple & Effective: Nishant Sood Updated On Thu, Apr 17th, 2025 by Saurenergy Tell us about your journey. How do you transition from a finance background to the solar industry? Nishant Sood: I’m a mechanical engineer by background—I graduated from IIT in the early 2000s, followed by an MBA in finance. It was a fairly typical path: IIT, then IIM, and straight into investment banking. I graduated from […] Read more
UltraTech To Tap AMPIN’s 75 MW Solar Project For Captive Power Updated On Thu, Apr 17th, 2025 by Saurenergy UltraTech Cement has signed an energy supply agreement and a share subscription and shareholders agreement to acquire a 26% stake in AMPIN C&I Power Eight Private Limited, a company involved in the generation and transmission of renewable energy. AMPIN C&I Power Eight, based in New Delhi, is a special purpose vehicle (SPV) set up to […] Read more
Bigger & Faster – South India’s Renewable Comeback Updated On Wed, Apr 16th, 2025 by Saurenergy South India, which heralded some of the earliest large-scale solar and wind projects in the country, is now further expanding its clean energy footprint. Again, one could say that some of India’s most notable renewable achievements came from the region before 2020. From the then-largest solar plant at Kamuthi in Tamil Nadu with a 648 […] Read more
BrightNight, Hero Future Energies Inks PPA With NTPC For FDRE Project Updated On Wed, Apr 16th, 2025 by Saurenergy BrightNight has signed a power purchase agreement (PPA) with state-run NTPC to supply 110 MWac of firm and dispatchable renewable energy (FDRE) over 25 years. The company said, “The energy will be delivered from a 350 MWp solar-wind hybrid project integrated with a 100 MWh battery energy storage system in Rajasthan, and connected via the […] Read more
Serentica, NTPC Sign PPA To Supply 200 MW FDRE To UP DISCOMs Updated On Tue, Apr 15th, 2025 by Saurenergy Serentica Renewables has signed a power purchase agreement with state-run NTPC Ltd to supply 200 MW of firm and dispatchable renewable energy (FDRE) to Uttar Pradesh’s distribution companies (DISCOMS). The project will combine solar, wind, and battery storage assets across multiple states to deliver on-demand renewable power, particularly during the state’s morning and evening peak […] Read more
India’s Rooftop Solar Poised To Hit 25-30 GW By FY27: CareEdge Updated On Tue, Apr 15th, 2025 by Saurenergy India’s rooftop solar energy capacity is projected to surge, rising from 17 GW to an estimated 25–30 GW between FY25 and FY27, according to CareEdge Research. With a total renewable capacity of 220 GW as of FY25 and a national target of 300 GW solar capacity by 2030. Rooftop solar, particularly in the Commercial & […] Read more
TPREL Hits 10.9 GW Capacity With NTPC’s 200 MW FDRE Deal Updated On Mon, Apr 14th, 2025 by Saurenergy Tata Power Renewable Energy Limited (TPREL), signed a Power Purchase Agreement (PPA) with NTPC Limited (NTPC), to develop a 200 MW Firm and Dispatchable Renewable Energy (FDRE) project. Tata Power Company subsidiary’s FDRE project is spread across multiple locations in India and is set to be completed within 24 months. This project is expected to […] Read more