Adani Green Commissions 250 MW Rajasthan Solar Project Updated On Thu, Mar 20th, 2025 by Saurenergy Adani Green Energy Limited (AGEL) has taken another step toward expanding its renewable energy footprint by commissioning a 250 MW solar power project at Bhimsar, Rajasthan, through its subsidiary. In a regulatory filing, the company announced, “Adani Green Energy Twenty-Four Limited’s latest commissioning has pushed AGEL’s total operational renewable energy capacity to 12,841.1 MW.” The […] Read more
News In Brief March 19: US Solar Cell Plant, Tripura Solar Subsidy, Prysmian-Edison Deal, Updated On Wed, Mar 19th, 2025 by Saurenergy Tripura Has Installed 12,800 Solar Plants: Power Minister Tripura has already completed the installation of about 12,800 solar plants, according to state power minister, Ratan Lal Nath. He added that the state will receive a subsidy of up to Rs 85,800 for 3-kilowatt solar plants. Under the scheme, Tripura offers residential electricity consumers will receive […] Read more
BHEL Set To Build 1.2 GW Solar Project At Khavda, Issues Tender Updated On Tue, Mar 18th, 2025 by Saurenergy Gujarat is set to host another project led by Bharat Heavy Electricals Limited’s (BHEL) solar division. The project included selecting contractors for developing and commissioning the project, which consists of a 4×300 MW Khavda Solar PV plant. This would take the total capacity for the project to 1.2 GW. The tender also involves setting up […] Read more
Top 5: Factors Responsible for Glass Breakage in Solar Modules Updated On Thu, Mar 13th, 2025 by Saurenergy Glass breakage is a growing concern for the solar power plant operators. With the trend towards double glass sided modules as seen in Bifacials, or TOPCon with double glass sided construction, the changes in solar PV module design and materials mean breakages are now a bigger risk than ever. These breakages can be due to […] Read more
Rajasthan’s Cumulative Power Generation Crosses 10 GW Updated On Tue, Mar 11th, 2025 by Saurenergy Rajasthan’s Minister of State for Energy (Independent Charge) Hiralal Nagar said that the state’s cumulative power generation has crossed 10 GW. The minister shared the data while speaking before the Rajasthan Legislative Assembly. The minister said that this capacity came through all possible sources of fuels. He also said that the peak hour demand for […] Read more
Australia Set for Solar With 8 Hour BESS Backup Updated On Mon, Mar 10th, 2025 by Saurenergy Australian Infrastucture investor Quinbrook Infrastructure Partners, has announced plans to pioneer a global market first in advanced long duration energy storage solution developed in a technical collaboration with CATL, the world’s leading battery energy storage system (BESS) manufacturer. The groundbreaking storage solution, believed to be the world’s first genuine 8-hour battery at more than double […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more
Solidus Techno Power Appoints Shiva Kumar Ram As Director Of Operations Updated On Thu, Mar 6th, 2025 by Saurenergy Punjab-based Solidus Techno Power Pvt. Ltd. has appointed Shiva Kumar Ram as its Director of Operations. Ram comes with a career spanning over three decades in power generation, renewable energy, and strategic project execution, Ram is set to elevate Solidus Techno Power’s operations. Solidus has been on an accelerated growth streak in the past year, […] Read more
Lakshadweep Opens Bids For Hybrid Rooftop Solar Project Updated On Wed, Mar 5th, 2025 by Saurenergy The Lakshadweep Administration, Union Territory (UT) Kavaratti Electricity Department has invited online bids to develop hybrid rooftop solar power plants with Battery Energy Storage System (BESS). The last date for bids submission is March 21st, 2025. The selected bidder will be responsible for, “Supply, Installation, Testing, Commissioning and Operation and Maintenance of 2,107 kW Hybrid […] Read more