Q3FY25: 10 Major Takeaways From SJVN Investors Call Updated On Tue, Feb 18th, 2025 by Saurenergy SJVN Limited, an Indian Public Sector Enterprise, which was earlier confined to hydroelectric power has now diversified its energy portfolio. The company is now foraying into several new renewable energy projects ranging from floating solar, vanilla solar and other projects. In its latest investors call, the company talked about its performance, challenges and current pace […] Read more
DCS Engineer – Hardware & Software Updated On Tue, Feb 18th, 2025 by Saurenergy Responsibilities:- End to End project design & engineering Efficient execution of Power & Water as well as Lump Sum Turnkey (LSTK) projects Should have adequate experience in Hardware Engineering, Panel design, Understanding the Network Architecture Understanding of buyouts such as (HMI, Servers, Cables, Control desk/furniture, Field Instruments, Relays, Barriers, HMI, UPS, Chargers, LVS etc.) Experience […] Read more
Deputy Manager – Design Updated On Mon, Feb 17th, 2025 by Saurenergy Roles and Responsibilities:- Main responsibilities are:- Design of the Solar projects (DC + AC ), prepare Bill of materials, Technical Specification of all BOM items following all Indian/International standards & norms, review and approval of documents, sizing calculations, reports Planning and preparation of PV array layout with help of Autocad draftsman, positioning of ICR Blocks […] Read more
NTPC REL Issues Tender To Build 110 MW Wind Project in Khavda Updated On Mon, Feb 17th, 2025 by Saurenergy NTPC Renewable Energy Limited (NTPC REL), has issued a tender to install Wind Turbine Generators for a 110 MW Inter-State Transmission System (ISTS-Connected) wind energy project. NTPC’s renewable energy arm is set to develop this project at Khavda NTPC RE Park. It has sought bids for the project up till March 25th, 2025. NTPC REL […] Read more
Wind Turbine SCADA PPC and Control Engineer Updated On Mon, Feb 10th, 2025 by Saurenergy Responsibilities:- Perform site commissioning & engineering for Wind Turbine Pitch system, CMS, SCADA and PPC Should be aware of SCADA Architecture with various interfacing protocol standards viz Modbus RTU/TCP-IP, OPC, DNP3, IEC etc. System understanding on Renewable (Wind, Solar) power generation process Compile data and write reports for renewable Wind projects. Working knowledge of industry […] Read more
H.G. Infra Sets Up Subsidiary To Expand Into BESS Sector Updated On Thu, Feb 6th, 2025 by Saurenergy Gujarat-based H.G. Infra has expanded into the Battery Energy Storage System (BESS) segment with the incorporation of its new subsidiary, ‘H.G. Gujarat BESS Private Limited’. The H.G. Infra announced the incorporation of the subsidiary in a regulatory filing. It said, “This Special Purpose Vehicle (SPV), H.G. Gujarat BESS Private Limited, has been incorporated as a […] Read more
Australia Risks 12-18 GW Renewable Gap Due To Slow Investment, Study Finds Updated On Mon, Feb 3rd, 2025 by Saurenergy Australia has run into plenty of problems regarding its solar capacity. 2024 saw the continuing issue of curtailments as solar was regularly oversupplied to a grid run on baseload coal and gas power. The rush to build large batteries has helped, but not enough clearly. The National Electricity Market (NEM) is stalling investment in Australia’s […] Read more
Shakti Pumps Cites DCR Cells Shortage, Prices For ‘Moderate’ Growth Updated On Thu, Jan 30th, 2025 by Saurenergy Issues linked to Domestic Content Requirements (DCR) mandates in solar projects appear to be reaching a head for solar developers in India. The mandate, which enforces use of only DCR cells and modules for almost all solar projects in India with exemptions only for select categories, has been causing a lot of heartburn in the […] Read more
Shakti Pumps Delivers With 130% Profit Rise in Q3 Fy25 Updated On Mon, Jan 27th, 2025 by Saurenergy Indore based Solar pump leader Shakti Pumps declared its Q3 results on Friday evening. The company reported a 130.09% year-on-year (YoY) jump in net profit at Rs 104 crore for the third quarter that ended December 31, 2024. In the corresponding quarter of the previous fiscal, the company had posted a net profit of Rs […] Read more