Odisha Issues Tender For Off-Grid Solar Pumps Updated On Fri, Jan 10th, 2025 by Saurenergy The Odisha Renewable Energy Development Agency (OREDA) has issued a tender for off-grid solar pumps. The state nodal agency issued the tender under the PM-KUSUM scheme. The agency asked the eligible bidders to submit their bids by February 10, 2025. With this tender, OREDA plans to replace the existing diesel-run agricultural pumps with solar pumps. […] Read more
LG Energy To Supply Cylindrical Batteries for Aptera’s Solar EVs Updated On Fri, Jan 10th, 2025 by Saurenergy LG Energy Solution has announced its partnership to supply cylindrical batteries to Aptera Motors Corp. (Aptera), a solar electric vehicle manufacturer. The agreement follows the signing of a three-party Memorandum of Understanding (MoU) in Las Vegas between LG Energy Solution, Aptera, and CTNS, a battery module and pack manufacturer. The three companies will collaborate on […] Read more
Rayzon Solar’s Chirag Nakrani To Feature In Shark Tank India Updated On Thu, Jan 9th, 2025 by Saurenergy Founder and Managing Director of Rayzon Solar–Chirag Nakrani is now all set to feature in Shark Tank India Season 4. The green entrepreneur is set to feature as an investor (a shark) in one of the special editions of the famous show. The show is now hosted on OTT platform-Sony Liv. Shark Tank India has […] Read more
EU Solar Hits 65.5 GW, Risks Missing 2030 Target by 100 GW Updated On Thu, Jan 9th, 2025 by Saurenergy The European Union (EU) solar market reached a new all-time high of 65.5 GW, but the annual growth has drastically decelerated. The market surged in the utility-scale solar market segment in 2024 at the expense of residential rooftop solar losses, found a Solar Power Europe report. The EU Market Outlook for Solar Power 2024-2028 warns […] Read more
1 GW Module Order For Saatvik Green Valued At Rs 1500 Cr. Updated On Thu, Jan 9th, 2025 by Saurenergy Saatvik Green Energy Limited announces its historic win of a 1 GW solar PV module supply contract from a leading energy producer. The deal, valued at over ₹1,500 crore, represents a significant milestone in the company’s expansion. Saatvik, as per customized specifications, will supply advanced technology N-TOPCon solar PV modules & commence the entire delivery […] Read more
2024: Germany’s Solar Production Exceeds 100 GW Mark Updated On Wed, Jan 8th, 2025 by Saurenergy At the turn of the year, Germany’s total solar output, including all solar power plants installed in the country, has now exceeded the 100 gigawatts (GW) mark. These recent projections were made by the German Solar Industry Association, based on data from the Federal Network Agency (BNetzA). The solar power plant portfolio covered around 14 […] Read more
Green Jobs: Goldi Solar, Suzlon Announce Plans To Skill Workforce Updated On Tue, Jan 7th, 2025 by Saurenergy Two Indian renewable energy companies-Goldi Solar and Suzlon Energy have now announced their plans to skill the workforce for green jobs. Indian solar module manufacturer Goldi Solar has signed a Memorandum of Understanding (MoU) with SN Patel Institute of Technology, R. N. G. Patel Institute of Technology, and UKA Tarsadia University for training the future workforce […] Read more
ACME Solar Appoints Dinesh Chadha As President, Renewable Energy (Senior Management) Updated On Tue, Jan 7th, 2025 by Saurenergy Gurugram-based ACME Solar has announced the appointment of Dinesh Chadha as the President, Renewable energy of the company. The company said in a regulatory filing, “Dinesh Chadha holds a bachelor’s degree in Electrical Engineering from Nagpur University. Before joining Acme Solar, he served as the Managing Director at Linxon India (earlier ABB India) for India […] Read more
REIL Seeks Proposal To Build 15 MW Rooftop Solar Project Updated On Tue, Jan 7th, 2025 by Saurenergy Rajasthan Electronics and Instruments Limited (REIL) recently released a tender seeking proposals for the empanelment of eligible bidders to design, supply, and commission a 15 MW solar project. Bidders must submit their bids by January 24, 2025. The tender aims to develop grid-connected rooftop solar power projects. The project is expected to be completed within […] Read more