Deputy Manager – Design Updated On Mon, Feb 17th, 2025 by Saurenergy Roles and Responsibilities:- Main responsibilities are:- Design of the Solar projects (DC + AC ), prepare Bill of materials, Technical Specification of all BOM items following all Indian/International standards & norms, review and approval of documents, sizing calculations, reports Planning and preparation of PV array layout with help of Autocad draftsman, positioning of ICR Blocks […] Read more
New Recycling Method Makes Perovskite PV Cells Sustainable Updated On Fri, Feb 14th, 2025 by Saurenergy Perovskite photovoltaics have emerged as a new solar energy technology, offering high efficiency and low-cost manufacturing compared to traditional silicon-based counterparts. However, sustainability concerns – such as toxicity, limited recycling options, and resource depletion – pose significant challenges to their widespread adoption. A new study published in Nature by researchers from Cornell University and Linköping […] Read more
Programme Associate – G6 Updated On Tue, Feb 11th, 2025 by Saurenergy Duties and Responsibilities:- Support the implementation and management of the Programme Provide dedicated programme, research, and administrative support to programme teams; prepare and/or consolidate comprehensive reports,documentation, correspondence, briefing notes, etc.; Revise and review correspondence and documentation, providing feedback and making amendments where appropriate, to contribute to production of these materials to time and quality standards. […] Read more
Assistant Manager – Quality (Module)_AM Updated On Thu, Feb 6th, 2025 by Saurenergy Responsibilities:- Implementation of Final Quality testing as per manufacturing Quality Plan Final Quality Audit as per Defined Frequency and manufacturing Quality Plan NC management and Identification and Traceability of Non-conforming Materials Perform Data Analysis for Post- Lamination Defects(Visual / EL / IV/ HV) and preparation of Root cause analysis and Action plan for Reduction of […] Read more
Budget 2025: Experts Expect Spur In India’s Renewable Growth Updated On Mon, Feb 3rd, 2025 by Saurenergy The 2025 Budget brought forward by Union Finance Minister Nirmala Sitharaman raised new hopes for the Indian solar sector. With an increase in the budgetary allocations for the overall solar sector and higher budgets for key schemes like PM Surya Ghar, PM-KUSUM and solar power transmission infrastructure, the industry is looking at a healthy growth […] Read more
Budget 2025- Green Stocks Fail To Fire Despite Manufacturing Push Updated On Sat, Feb 1st, 2025 by Saurenergy The 2025 budget presented by Finance Minister Nirmala Sitharaman had one announcement at the end that overshadowed almost everything mentioned before. Yes, we are referring to the hike in Income Tax exemption limit for salaried individuals to Rs 12 lacs, a move that is seen as the biggest effort yet to spur domestic consumption by […] Read more
NHPC, AP Genco Form JV To Develop 5 GW PSP Projects Updated On Fri, Jan 24th, 2025 by Saurenergy The National Hydroelectric Power Corporation (NHPC) partnered with Andhra Pradesh Power Generation Corporation Limited (APGENCO) to develop a 5.07 GW pumped storage project (PSPs) across five locations in Andhra Pradesh. The NHPC told about its plans for the joint venture in Andhra Pradesh in a regulatory filing. NHPC said, “The Joint Venture Company envisions planning, […] Read more
Civil & Structural Design Engineer – Renewables Updated On Wed, Jan 15th, 2025 by Saurenergy The person shall be capable of complete design and detailed engineering of Civil Structural Engineering of PV Solar Power plants. The Design Engineer is capable of carrying out the entire design for a project or a set of smaller projects including co-ordination with other disciplines viz., Electrical, Instrumentation and Mechanical Design Engineers shall work with […] Read more
NTPC REL Issues 2.5 GW BESS Tender For Its Thermal Plants Updated On Tue, Jan 14th, 2025 by Saurenergy NTPC REL recently released a tender to develop a 2500 MW/10,000 MWH Battery Energy Storage System (BESS) project. The NTPC subsidiary has planned the project as spread across NTPC thermal power stations. The last date to submit the bids is February 17, 2025. The tender document elaborated on the project’s capacity. It mentioned, “The battery […] Read more