AC/DC Ratio And Impact on CUF- APTEL Directs HERC To Do The Numbers Updated On Mon, Apr 28th, 2025 by Saurenergy In an interesting case originating in Haryana, the Appellate Tribunal For Electricity (APTEL) bench has sent the parties involved back to the Haryana Electricity Regulatory Commission (HERC). The intent was to enable the state commission get a chance to actually do the prudent thing and calculate the impact of considering the AC/DC ration as 1:1 […] Read more
Cleantech Commissions 100 MWp RE Park For Anthea & Others Updated On Fri, Apr 25th, 2025 by Saurenergy Cleantech Solar, a renewable energy solutions provider has commissioned an open-access solar PV project for industrial customers at its 100 MWp solar park in Maharashtra. This is Cleantech Solar’s seventh renewable energy park in the state. The company last year commenced the commercial operation of its sixth open-access solar PV project of ~150 MWp, for […] Read more
IQC Engineer Updated On Wed, Apr 23rd, 2025 by Saurenergy Prepare and maintain documentation for IQC of raw material Responsible to give OJT to new employee. Encapsulant (EVA, POE, EPE) cheching gel content test.Glass to EVA and POE to backsheet adhesion test. Glass to EVA and POE to backsheet adhesion test. Glass, Frame, Sealant, Junction box, Interconnector, Backsheet, Flux, Packing box, Wooden pallet checking visually […] Read more
IPQC Engineer Updated On Wed, Apr 23rd, 2025 by Saurenergy Good knowledge of Production Process of Solar Modules. Visually line Observation Check and Control Defects.. Control & Maintain Documents and Records. Stock Verification (B, R, & A Grade wise) Education:- BE /Diploma Electrical /EC Experience:- Exp.2-4 Year Preferable Solar Experience Location:- Mehsana, Gujarat. Company Overview:- Established in 1998 as a proprietary concern and now listed […] Read more
Asst.Manager Updated On Wed, Apr 23rd, 2025 by Saurenergy To Train the Operators & Control to Men Power Rejection Control using 7 QC tools. Taking Corrective and Preventive action (CAPA) against any defects. Reduce Customer Complaint by taking Preventive Action. Analysis of Field Complaints. Control & Maintain Documents and Records. Education:- BE /Diploma Electrical /EC Experience:- Exp.4-6 Year Preferable Solar Experience Location:- Mehsana, Gujarat. […] Read more
Lead Engineer – Substation Electrical Design Updated On Wed, Apr 23rd, 2025 by Saurenergy We are seeking a Lead Substation Electrical Design Engineer for Solar PV Project for our design team. This role is responsible for design and engineering the solar ground project. Responsibilities:- Carrying out HV/ EHV substation design and drafting for substations from 66kV to 220kV. Experience in substation designs/Drafting from EHV substation designs, Switchyard layouts experience is must. […] Read more
Adani Ends Up With 8534 MW From Mfg. Linked Tender, Azure Left With 1667 MW Updated On Mon, Apr 21st, 2025 by Saurenergy In a petition before the Central Electricity Regulatory Commission (CERC) where the commission finally stayed away from any comment or order, SECI has allocated 8534 MW out of the total 12000 MW to Adani Green, while Azure Power, which had won 4000 MW in comparison to Adani’s 8000 MW in the same tender, has been […] Read more
European RE PPA Market Adds 19 GW New Capacity In 2024 Updated On Thu, Apr 17th, 2025 by Saurenergy The European renewable energy Power Purchase Agreement (PPA) market saw a strong recovery in 2024, with nearly 19 gigawatts (GW) of new capacity contracted, according to Wood Mackenzie’s latest Europe Renewables PPA Tracker report. The report highlights a surge in PPA activity, with Spain and Germany leading the market, accounting for 30% of total capacity. […] Read more
Bigger & Faster – South India’s Renewable Comeback Updated On Wed, Apr 16th, 2025 by Saurenergy South India, which heralded some of the earliest large-scale solar and wind projects in the country, is now further expanding its clean energy footprint. Again, one could say that some of India’s most notable renewable achievements came from the region before 2020. From the then-largest solar plant at Kamuthi in Tamil Nadu with a 648 […] Read more