SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more
NHPC Receives LoI From GUVNL For 200 MW RE Park In Khavda Updated On Fri, Mar 15th, 2024 by Saurenergy NHPC (National Thermal Power Corporation) a public sector undertaking under the ownership of the Ministry of Power recently announced that it received a letter of intent (LoI) from Gujarat Urja Vikas Nigam (GUVNL) for the 200 MW Khavda project. NHPC received this letter for a 200-megawatt (MW) solar power project at the 1125 MW Gujarat […] Read more
Highlights from Economic Survey for RE Sector in 2021 Updated On Tue, Feb 1st, 2022 by Saurenergy The Economic Survey, which receded the annual budget of the government, is a widely anticipated document, seen more as a sort of white paper on what the government of the day considers its key achievements, and indications of the way ahead. To that extent, the latest Economic Survey document, all 442 pages of it in […] Read more
MNRE’s New Scheme Guidelines for 12,000 MW CPSU Phase-II Project Updated On Tue, May 11th, 2021 by Saurenergy The ministry of new and renewable energy (MNRE) has released the newly amended scheme guidelines for implementation of Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme) for setting up 12,000 MW grid-connected Solar PV power projects by the Government Producers. These 12,000 MW projects will be produced by the government producers with Viability […] Read more
REC Limited Raises USD 500 Million Through Bonds Updated On Fri, Feb 26th, 2021 by Saurenergy REC Limited has successfully raised USD 500 million 5.5-year Reg-S only bonds issued under its Global Medium Term Programme of USD 7 billion. Proceeds of the bond will be used to finance power projects following the approvals granted by the RBI from time to time and under the ECB Guidelines. This is REC Limited’s eighth […] Read more
763.47 MW Added in November, India’s Total RE Capacity Surpasses 90 GW Updated On Fri, Dec 11th, 2020 by Saurenergy India’s renewable energy (RE) capacity has surpassed the 90 GW mark, with 763.47 MW of new capacity added during the penultimate month of 2020. The Ministry of New and Renewable Energy (MNRE) has issued a monthly summary for the Cabinet for the month of November 2020, detailing all the events and development that took place […] Read more
SECI to Hold Virtual Pre-Bid Meetings, Asks Stakeholders to Submit Queries Online Updated On Mon, May 18th, 2020 by Saurenergy SECI has issued two notifications regarding pre-bid and stakeholder consultation meetings for two of its active tenders for solar power projects in India The Solar Energy Corporation of India (SECI) has issued two notifications regarding pre-bid and stakeholder consultation meetings for two of its active tenders for 2000 MW solar energy projects (ISTS-IX) and the […] Read more
Top 10 States for Renewable Energy Installations in Last 4 Years Updated On Fri, May 15th, 2020 by Saurenergy A list of the top 10 states that have implemented the maximum amount of renewable energy projects in the last four years. As part of Intended Nationally Determined Contributions as per the Paris Accord on Climate Change, India has undertaken to install at least forty percent of its total electricity generation capacity from non-fossil fuel […] Read more
CERC Issues Draft Regulations for Determination of RE Tariff Updated On Fri, May 1st, 2020 by Saurenergy CERC has released the draft of its 2020 regulations for tariff determination from renewable energy (RE) sources, with comments invited until May 28, 2020. The Central Electricity Regulatory Commission (CERC) has released the draft of its 2020 regulations for the “Terms and Conditions for Tariff determination from Renewable Energy Sources.” The national power sector regulator has […] Read more