SJVN Arm Calls Bids for Projects of 1465 MW Aggregate Capacity Updated On Tue, Oct 31st, 2023 by Saurenergy SJVN Green Energy Limited (a wholly owned subsidiary of SJVN Limited) invites online bids from eligible bidders on two stage (stage-1: techno-commercial bid and stage-2: price bid) for the manufacture and supply of solar PV modules of total 1465 MWp capacity for solar power projects to be installed at various states of India. The projects […] Read more
Mitsui Chemicals India Backsheet Durability Test Sequence (BDTS) Updated On Tue, Sep 26th, 2023 by Saurenergy Why is BDTS testing required? Solar PV modules require the Backsheet Durability Test Sequence (BDTS) to ensure the long-term performance, safety, and reliability of the photovoltaic (PV) panels. The back sheet is a critical & vulnerable component of a solar module, located on the rear side of the PV cells. It serves as a protective […] Read more
Adani Green Meets Manufacturing Commitment, SECI Certifies Plant Updated On Fri, Aug 18th, 2023 by Saurenergy Adani Green Energy Ltd has informed the stock exchanges that its associate company, Mundra Solar Energy Ltd., has received approval for its solar photovoltaic plant from the Solar Energy Corp. of India. The renewables arm of the Adani Group received the commercial operational date certificate from SECI for solar PV cells and solar PV modules […] Read more
August ALMM Update, Approved Capacity Nears 20 GW Updated On Fri, Aug 4th, 2023 by Saurenergy The Approved Models and Manufacturers of Solar Photovoltaic Modules (ALMM), which is a key measure announced by the MNRE in 2019 to give a boost to domestic manufacturing and reduce reliance on imports has updated its list. The list mandates the enlistment of only those models of solar PV module manufacturers, under ALMM, which comply […] Read more
Bangladesh Opens Up Small, But Profitable Opportunity Next Door For Indian Developers Updated On Fri, May 19th, 2023 by Saurenergy Of late, Bangladesh, powered mostly by thermal power and blessed with an unfavourable location for hydropower, has made a serious effort to ramp up its renewable capacity. The country, which has a deficit of power supply that forces it to import from India, hopes that by 2041, 40 per cent of its total power requirements […] Read more
Technical Sales and Marketing Engineer Updated On Tue, Mar 21st, 2023 by Saurenergy Create PV Array Layouts, Electrical Panel Schedules, Single-Line diagrams, or connection diagrams for solar electric systems, using computer-aided design (CAD)/ SketchUp Perform accurate system sizing calculations Execute designs that adhere to grid compliance and permitting requirements Assist the Application Engineering Team in: PV SYST simulation & energy estimations, bill of material preparation, handling the routine […] Read more
Adani Green Energy Records India’s Largest Operating Renewable Portfolio at 8,024 MW Updated On Fri, Mar 3rd, 2023 by Saurenergy Adani Green Energy (AGEL) has revealed that its 700 MW hybrid green energy project has been set into operation, following which, the firm’s cumulative operating renewable portfolio has reached 8,024 MW. This is India’s largest operating renewable portfolio. The said project is AGEL’s fourth wind-solar hybrid power plant that is fully in operation in Rajasthan’s […] Read more
Various Posts for Young Professional Updated On Mon, Oct 31st, 2022 by Saurenergy SECI invites applications for various position of Young Professional from talented, innovative and dynamic candidates who are keen to demonstrate their proven academic, credential, professional achievements. Details of the same are given below: SI.N o Name of Position No. of YP Eligibility Criteria 1 YP (Hydrogen Energy) 01 Degree in Mechanical/ Chemical/ Electrical/ […] Read more
Karnataka Power Corp Floats O&M Tender for 1.15 MW in Bengaluru Updated On Fri, Oct 14th, 2022 by Saurenergy Karnataka Power Corporation Ltd. (KPCL) has floated a tender for the operation and maintenance (O&M tender) of 1.15 MW capacity (AC). This 1.15 MW solar power plant is a floating solar plant installed at YCCPP Raw Water Pond, Bengaluru. The last date for submitting the online bid is October 28, 2022, till 4:00 pm and […] Read more