CAD Engineer (Civil) – Solar EPC Updated On Thu, Apr 3rd, 2025 by Saurenergy Design & Drafting:- Prepare 2D and 3D CAD drawings for solar power plant layouts, including site plans, structural foundations, and mounting structures. Develop civil and structural designs for solar projects, including land grading, pile foundations, RCC structures, and drainage systems. Optimize layout designs based on site conditions, solar panel configurations, and structural stability. Work on […] Read more
Global Business Analyst Updated On Thu, Apr 3rd, 2025 by Saurenergy We are currently seeking a self-driven Global Business Analyst with a passion for procure to pay to join the Global Procure to Pay Tower organization. The Global Business Analyst will gather and analyze data to guide decision making and improve performance. The role is accountable for working with our global workstream leaders and program leadership to provide data […] Read more
Sales Support Engineer Updated On Thu, Apr 3rd, 2025 by Saurenergy A Sales Support Engineer plays an important role in a company as they are responsible for ensuring that customer requests are met with the highest level of technical accuracy and precision. They work closely with the sales team and customers to understand project specifications, analyze CAD files, and design preliminary hot runner systems using 3D […] Read more
Piping Material Design Engineer Updated On Thu, Apr 3rd, 2025 by Saurenergy Responsibilities:- Candidate should be proficient in Piping Materials with experience in engineering consultancy on industrial design projects like chemical, pharmaceutical, bulk drugs, etc. Comprehension of client / project requirements for timely completion and submission of project deliveries. Possess good knowledge of Codes like ASME B31.3, ASME B31.12, ASME B31.1, related ASTM / API / BS […] Read more
Consumers In Karnataka To Pay 8 Charges For Open Access: KERC Updated On Thu, Apr 3rd, 2025 by Saurenergy Months after the Karnataka High Court struck down the state’s existing open access rules, the Karnataka Electricity Regulatory Commission (KERC) has introduced a revised regulatory framework. The newly notified KERC (Terms and Conditions for Open Access) Regulations, 2025, aim to streamline access for power consumers and generators. Eight Charges for Open Access Connections Under the […] Read more
Avaada Slips Up As CERC Upholds Cancellation Of Connectivity in MP Wind Projects Updated On Thu, Apr 3rd, 2025 by Saurenergy The Central Electricity Regulatory Commission (CERC), in an order dated March 30 involving Avaada Energy and Central Transmission utility (CTUIL), passed an order that censures both the parties involved. For Avaada, the blow is heavier because the CERC eventually upheld the decision of the CTUIL to cancel the connectivity license accorded to Avaada for its […] Read more
ACME Solar Secures ₹2,491 Cr Refinancing for 490 MW RE Projects Updated On Thu, Apr 3rd, 2025 by Saurenergy ACME Solar Holdings, a unit of the diversified ACME Group, has secured a Rs 2,491 crore long-term project finance facility for 18-20 years. The refinancing will help the company restructure its existing debt and lower financing costs for its 490 MW operational renewable energy projects across Andhra Pradesh, Rajasthan, and Punjab. The refinancing, secured from […] Read more
SPML Infra In Tie-Up With Energy Vault To Make, Deploy Batteries In India Updated On Wed, Apr 2nd, 2025 by Saurenergy New Delhi based SPML Infra Limited has signed a licensing and royalty agreement with leading storage solutions firm Energy Vault. For SPML Infra, with its hitherto specific focus on India’s water and energy infrastructure, the tie-up marks a significant push into the energy infrastructure space, where it has had a small but significant presence until […] Read more
DM / Manager – Project Management Updated On Wed, Apr 2nd, 2025 by Saurenergy Manage operationally and functionally the Projects he/she is assigned to:- Manage OEM/OES Projects (Component, System with known technology components, …) Is responsible for the achievement of the Project KPI in terms of profitability (both product/development vs Development Activity Payback and Extended Margin), Quality and Production Preparation Secure Project resources and control them Drive the Associated […] Read more