Amendments to Guidelines for Tariff Based Bidding on Solar Projects Updated On Thu, Jan 10th, 2019 by Saurenergy MNRE has made amendments to the guidelines for the bidding process of solar photovoltaic projects. Issuing changes in the bid submission deadline, the period of financial closure and commissioning period The Ministry of New and Renewable Energy (MNRE) has issued a notification with amendments to the guidelines for the tariff-based competitive bidding process for […] Read more
List of BIS Standards Applicable for Components of Solar PV Applications Issued Updated On Tue, Jan 8th, 2019 by Saurenergy The list includes six products along with Indian Standard Number and the Title of Indian Standard. The Ministry of New and Renewable Energy (MNRE) has also issued the list of BIS standards applicable for components of solar PV applications. The list includes six products along with Indian Standard Number and the Title of Indian Standard. […] Read more
MNRE Issues Technical Specifications for 12 W White-LED based Solar Street Lighting System Updated On Tue, Jan 8th, 2019 by Saurenergy The government said in a notification that, indigenously manufactured PV module should be used in the system. The Ministry of New and Renewable Energy (MNRE) has issued technical specifications for 12 W White-LED based solar street lighting system. The government said in a notification that, indigenously manufactured PV module should be used in the system. […] Read more
MNRE Extends BIS Certification Deadline for Solar Inverters till June 30, 2019 Updated On Tue, Jan 8th, 2019 by Saurenergy It further added that, “These manufacturers will be allowed self-certification without submitting samples to test labs as the series guidelines for submitting samples to test labs are under preparation.” In a bid to provide relief to the industry, the Ministry of New and Renewable Energy (MNRE) has further extended the deadline for the Bureau of […] Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
NIT for Setting-Up 1.2GW ISTS Connected Solar PV Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The detailed Request for Selection (RfS) document will be available for downloading from January 14, 2019 onwards. The Solar Energy Corporation of India (SECI) has invited online bids for the setting up of 1200 MW ISTS connected solar PV power projects (ISTS-III). However, the detailed Request for Selection (RfS) document will be available for downloading from January […] Read more
SECI Invites Bids for 7.5GW Solar Projects in Leh, Kargil Updated On Wed, Jan 2nd, 2019 by Saurenergy Moreover, SECI will enter into the Power Purchase Agreement (PPA) with the successful bidders for purchase of solar power for a period of 35 years. The government-backed Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) document for selection of solar power developers for setting up of 7500 MW grid-connected solar […] Read more
Promotion of Solar Energy Updated On Thu, Dec 20th, 2018 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has been implementing various schemes in the country, including in Madhya Pradesh, to promote solar energy. The names of the schemes are as under: i. Development of Solar Parks and Ultra Mega Solar Power Projects. Scheme for setting up 1000 MW of Grid-Connected Solar PV Power Projects […] Read more
NTPC Invites Bids for 100 MW Floating Solar Project in Telangana Updated On Tue, Dec 18th, 2018 by Saurenergy The floating solar tender is a part of NTPC’s effort to ramp up its solar capacity which is currently at 870 MW. National Thermal Power Corporation (NTPC), India’s largest power generator has invited bids for the development of a 100 MW Floating Solar PV Project at NTPC’s thermal power plant in Ramagundam, Telangana. The closing […] Read more